My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03124
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3100
>
pf_03124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:41:59 PM
Creation date
12/8/2004 3:51:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />April 20, 1999 <br /> <br />~ <br />~/ <br /> <br />01292311 0050 <br />~TJi' J T IL.jii <br />Sybil C Smith <br />3075 Woodbridge St. <br />Roseville MN 55113 <br /> <br />RE: STREET RECONSTRUCTION, CITY PROJECT P-99-02-22 <br /> <br />Dea~IIEiI P 1iwcmd Sybil Smith: <br /> <br />As part of the upcoming street project on Woodbridge Street, the City will have the contractor remove and <br />replace the boulevard portion of residential driveways. The City Engineering Department has examined all <br />driveways for code compliance and existing and proposed grades. <br /> <br />The City of Roseville requires that all driveways be brought into compliance with City Code during a <br />permanent street upgrading. Driveways must be a minimum of thirty feet from an intersection right-of-way <br />line. Currently, the north edge of your driveway is less than thirty feet from the Woodlynn Avenue right-of- <br />way line. In order to comply with City Code, the driveway must be rebuilt at a point thirty feet south of the <br />Woodlynn Avenue right-of-way line. <br /> <br />As an alternative to moving your existing driveway, you can bring it into compliance by submitting an <br />application for a variance from City Code. I have enclosed the City variance application if you would prefer <br />this option. If approved, your driveway would be legal and there would be little or no change of location <br />necessary. <br /> <br />This variance application does need to go to before the Planning Commission and City Council for approval. <br />To make it on the agenda for the June 9, Planning Commission meeting, the application should be returned <br />by May 10,4:30 pm. <br /> <br />If you have any questions regarding this application or the street project, please do not hesitate to contact <br />me by telephone at 651-490-2221 or by email deb.bloom@ci.roseville.mn.us. <br /> <br />Sincerely, <br /> <br />Debra M. Bloom <br />Assistant Public Works Director <br /> <br />DMB:jm <br /> <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.