<br />APPENDIX CHAPTER 33
<br />
<br />1994 U~IFOR:vi BUE-DING ceDE
<br />
<br />SECTION 33~(g - GR!AID~NG f'lElES
<br />
<br />.
<br />
<br />3310.1 Ge81erat Fees shall be assessed in accordance with the provisions of this sec~io:1 or shall
<br />be as set forth in the fee schedule adopted by the jurisdiction,
<br />
<br />3310.2 Plan Review IF'ee~. When a plan or other clata are required to be submitted, a plan review
<br />fee shall be paid at the time of submitting plans and specifications for review. Said plan rev;ew fee
<br />shall be as set forth in Table A-33-A. Separate plan review fees s;lall apply to retaining walls or
<br />major drainage structures as required elsewhere in this code. For excavation and fill on the same
<br />site, the fee shall be based on the volume of excavation or fill, whichever is greater.
<br />
<br />3310.3 Grading Permit Fee~. A fee for each grz.ding permit shall be paid to the building official
<br />as set forth in Table A-33-B. Separate permits and fees shall apply to retaining walls or major drain-
<br />age structures as required elsewhere in this code. There shall be no separate charge for standard
<br />terrace drains and similar facilities.
<br />
<br />TABLE Ac33mA-G~ADING PLAN REVIEW FEES
<br />
<br />50 cubic yards (38.2 m3) or less ,..,."....,.....".....,...."..,...",.,.. :--;0 fee
<br />5 I to 100 cubic yards (40 m3 to 76.5 m3) ."".",..",.,."..,...",.",.,.,' $15.00
<br />101 to 1.000 cubic yards (77,2 m3 to 764.6 m3) "". ,. , , . , , , . ' , , , , . . , , , , . . , , , . .. 22,50
<br />1,001 to'IO,OOO cubic yards (765.3 m3 to 7645.5 m3) . , . . . , , , , , , . . . . . , . , , . , , , , , . " 30.00
<br />
<br />10,001 to 100,000 cubic yards (7646.3 m3 to 76 455 m3)-$30.00 for the first IO,OCO cubic yards
<br />(7645.5 m3), plus $15.00 for each additional 10,000 yards (7645.5 m3) or fraction there8f.
<br />
<br />100,001 to 200,000 cubic yards (76456 m3 to 152911 m3)-$165.00 for the first 100.000 cubic
<br />yards (76455 m3), plus $9.00 for eaC:l additional 10,000 cubic yards (7645,5 m3) or fraction .
<br />thereof.
<br />
<br />200,001 cubic yards (152912 m)) ormore-$255.CO forrhe first 200,000 cubic yards (152911 m3),
<br />plus $4.50 for each additional 10,000 cubic yards (7645.5 m)) or fraction thereof.
<br />Other Fees:
<br />Additional plan review required by changes, additions
<br />or revisions to approved plans . . , . . . . . . . . . . . . . , . , . . . , . , . . . . . . . , . . . ., $30,00 per hour'"
<br />(minimum charge-one-half hour)
<br />*Or the total hourly cost to the jurisdiction. whichever is the greatest. This cost shall include superv .sioC1, ove,head.
<br />equipment, hourly wages and fringe benefits of the employees involved.
<br />
<br />TABLE A.33.B~GRADlNJG PERMiT fEES1
<br />
<br />50 cubic yards (38.2 m3) or less ..................,...,.............,.,..... S: 5.00
<br />51 to 100 cubic yards (40 m3 to 76.5 m3~, ..,.........."...,.......,..,..,..,., 22.50
<br />
<br />101 to 1,000 cubic yards (77.2 m3 to 764.6 m3)-$22.50 for the first lOG cubi: yards (76.5 m3) plus
<br />$10.50 for each additional 100 cubic yards (76.5 m3) or fraction thereof.
<br />
<br />1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3}-$ 11 7.00 forthe first 1,000 cubic yards (764.6
<br />m3), plus $9.00 for each additional 1,000 cubic yards (764.6 m3) or fraction thereof.
<br />
<br />10,001 to 100,000 cubic yards (7646.3 m) to 76 455 m3)-$198.00 for the first 10,000 cubic yards
<br />(7645.5 m3), plus $40.50 for each addilicnal1O,OOO cubic yards (7645.5 m3) or fraction thereof.
<br />
<br />100,001 cubic yards (76 456 m3) or more-$562.50 for the first 100,000 cubic yards (76 455 m3), _
<br />plus $22.50 for each additional 10,000 cubic yards (7645.5 m3) or fraction thereof. ..,
<br />Other Inspections and Fees:
<br />I. Inspections outside of nonnal business hours ,."""....,.,.,.... 530,00 per hour2
<br />(minimum charge-two hours)
<br />
<br />1-512
<br />
<br />~.~
<br />
|