My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03154
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3100
>
pf_03154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:47:21 PM
Creation date
12/8/2004 3:55:03 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The current completed buildings on the Centre Pointe site are as follows: <br /> <br />Centre Pointe Development Developer YearBuih Square Foota2e <br />Residence Inn CSM 1998 75,391 <br />Fairfield Inn Torkelson 1998 37,013 <br />CSM Office Building CSM 1999 12,015 <br />Ehlers & Associates Ryan 1998 13,425 <br />Centre Pointe - Phase I Ryan 1998 25,445 <br />Centre Pointe - Phase II Ryan 1998 . 101,886 <br />Builders Association Ryan 1997 15,120 <br />Veritas Software - Phase I Ryan 1999 62,420 <br />Square foota2e to-date. Total SF 342,715 SF <br />Total allowable PUD S.F. Total SF 619,600 SF <br />Remaining new construction available Total SF 276,885 SF <br />based on PUD ' (Jan. 2000) <br />Requested addition to PUD Ryan 10% of Total SF 61,960 SF <br />Modified Total Allowable PUDS.F. 681,560 <br />Total S.F. Remainin2 to Develop 1l0%of Total 338,845 SF <br /> <br />In addition to the previous 1988 building construction of 110,000 s.f., the <br />allowable new building area under the March 1997 EA W and the approved PUD <br />is a.total of619,600square feet. Construction is on schedule to reach those totals <br />in the next three to four years (2003 to 2004), if not sooner. The Year 2000 <br />Veritas Master Site Plan, dated March, 2000, includes more general office space <br />and a reduction or elimination of Office/ShowrooIIllWarehouse structures. <br /> <br />Ryan has proposed development that would increase the total allowable building <br />area (or building cube) on the site by 10 percent (61,690 s.f.) more than the <br />previously approved total of 619,600 s.f. for a total of 681 ,560 s.f.. This proposed <br />modification is consistent with the approved plan, constitutes a minor <br />,modification from paragraph 38 of the original Planned Unit Development # <br />1177, is authorized under City Code ~ 1008:09.B.1. and is hereby approved. <br /> <br />With this modific().tion, there is a total of 338,845 s.f. remaining to be developed. ' <br />As now proposed and approved, the development will be divided among the <br />following parcels: <br /> <br />1. Lot 3,.BJock 1 Centre Pointe Business Park 2nd Addition will be developed <br />. as a 6,000 s.f. restaurant. <br /> <br />2. The southerly remainder of Lot 4, Block 1, Centre Pointe Business Park <br />and the nort:berly portion of Lot 5, Block 1, Centre Pointe Business Park <br />as described in,attachment "A" may be developed for up to 72,500 s.f. of <br />office space. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.