Laserfiche WebLink
<br />--- <br /> <br />---- <br /> <br />RCWD PERMIT NO. 97-06, continued.: <br /> <br />Page 2 <br /> <br />They found the project as planned to be in accordance with the Rules & Regu\ations and Guidelines <br />of the District and therefore approved the permit as requested, with the following additional <br />stipulations: <br /> <br />Stipulation: Applicant must notify RCWD immediately if regional pond expansion becomes <br />unfeasible. <br /> <br />It is the responsibility of the Permittee to provide all measures necessary to contain sediment on the <br />site during construction. This may require the use of erosion control measures not outlined on the <br />erosion control plan. If this requirement is not met, the Permittee may be ordered to provide additional <br />erosion control measures if deemed necessary by the District Inspector. It is also the responsibility of <br />the property owner to provide necessary maintenance to assure that the stormwater management <br />systems approved 88 part of this Permit will continue to function 88 originally designed. <br /> <br />NOTE FOR PROVIDERS OF A CASH SURETY: - Two (2) inspections of the project site are included <br />with this Permit, one after erosion control measures are in place and one after project co1Dpletion. <br />revegetation, and silt fence removal, and will be conducted to assure compliance with all agreements, <br />terms, and stipulations of this Permit. Failure to comply with the foregoing may result in forfeiture <br />of your cash surety, rescission of the Permit, and is in violation of Chapter 112.89 MSA, a <br />misdemeanor. Please notify the District Office in writing when project is complete and permanent <br />vegetative cover bas been established and a final inspection will be made. Any additional inspection, <br />requested or required, will be billed at $25/visit. <br /> <br />This document is not transferable, and is valid for eighteen months after the date of issuance. No <br />construction i:5 authorized beyond the ~ date f1 October 18, 1998. If Permittee requires more <br />time to complete construction, a renewal of the Permit will be necessary. <br /> <br />'.- <br /> <br />Please contact RCWD at 483-0634 when the project is about to commence so an inspector may view <br />the work in progress. By acceptance of this Permit, Permittee has consented to the foregoing. The <br />enclosed Owner's Certification form must be completed and forwarded within ten (10) days of project <br />completion. <br /> <br />.. <br /> <br /> <br />~~~~4J <br /> <br /> <br />..~ <br /> <br />of Managers <br /> <br />Date of Issuance: March 18, 1997 <br /> <br />jak <br />Form C Revised 1/911 <br /> <br />.",- <br /> <br />~ <br /> <br />