Laserfiche WebLink
<br />p <br /> <br />CHECKLIST FOR ENGINEERING REVIEWS <br />(Building Permits and Planning Files) <br /> <br />Item <br /> <br />Storm Sewer <br />· Connection to city main <br />· Roof drains <br />· Velocity into city system <br />· System capacity <br /> <br />Stormwater treatment/detention <br />Rice Creek watershed permit req'd? <br />Rice Creek contact Kate Drewry 483-0634 <br />· Max. pond slope 4: I <br />proposed 10 yr. nmoffrate = existing <br />10 yr. runoff rate <br />· Evaluate site for 100 yr. event to ensure <br />there is adequate storage <br />NURP Standard: dead storage= runoff <br />from 2.5" rainfall <br /> <br />Roadway cuts/crossings <br />Roadway should be replaced to existing <br />depths <br />· Jacking/boring especially for water <br />services tmder permanent streets <br />· R Cotm /MnDOT Permits <br /> <br />Degradation fee for roadway cut <br /> <br />Easements required <br />· Ramsey COtmty master street plan <br />· Existing or proposed public <br />utilities/facilities <br /> <br />Existing easements <br />· Keep large trees out of easements <br />· Easements/right of way to be <br />released/abandoned <br />· No structures over easements <br />· Raise existing utility structures to new <br />grade <br /> <br />Deferred assessments <br /> <br />Traffic circulation <br />· Impacts on public streets <br />. On-site circulation <br />Consultant review, ifneeessary <br /> <br />Street & Utility Contacts: <br />Duane Schwartz 490-2310 <br />Dan Hanson 490-2312 <br /> <br />Enldneerine: Contacts: <br />Debra Bloom 490-2221 <br />Doug Strong 490-2225 <br /> <br />Initiall Notes <br />Date <br /> <br />~ · \--..J \C'~ '"t2...)-:>c:; <br />\ I' \"~. 7T <br /> <br />~/A. <br /> <br />l(lf ~ 14a Ot.rt\ ~ \t1 ~\\()V\ d be, #MV'" <br />'f AJ.,tUt~J.' tv ~~k ~ !->4~t <br />UA!3 r,wlc (M\ ~ <br />?o. <br /> <br /> <br />~~~ <br /> <br />~~ <br /> <br />t-:>~~~ <br /> <br />~/A <br />