My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03174
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3100
>
pf_03174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:50:59 PM
Creation date
12/8/2004 3:57:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />storm water ponding/retention facility designed to accommodate the increased <br />runoff prior to discharge from the site into public waters or wetlands. <br /> <br />2. Review by City Engineer: All proposed storm water facilities shall be <br />reviewed by the City Engineer and certified for compliance with the City's <br />Surface Water Management Plan, National Urban Runoff Program (NURP) <br />standards, the Minnesota Pollution Control Agency's (MPCA) Urban Best <br />Management Practices, and anv established standards of the water management <br />organization having iurisdiction in the proiect area. <br /> <br />3. Commercial, Industrial, and Residential Development Affectation: All <br />commercial and industrial developments and redevelopments affecting more than <br />five (5) acres of land and all residential developments affecting more than five (5) <br />acres of land shall: <br /> <br />a. Be served by storm water ponding facilities, on or off site, <br />designed to remove a minimum of ninety percent (90%) of total suspended <br />solids resulting from the runoff from a one inch (1") rainfall event, and <br /> <br />b. Within the development, provide for settling chambers, sumps, dry <br />ponds or other devices to provide for the filtering or settling of fine sands <br />prior to discharge into the City's storm water system. <br /> <br />4. Private Storm Water Facilities: All private storm water facilities shall be <br />maintained in proper condition consistent with the performance standards for <br />which they were originally designed. All settled materials from ponds, sumps, <br />grit chambers, and other devices, including settled solids, shall be removed and <br />properly disposed of on a five (5) year interval. One to five (5) year waivers from <br />this requirement may be granted by the City Engineer when the owner presents <br />evidence that the facility has additional capacity to remove settled solids in <br />accordance with the original design capacity. <br /> <br />5. Inventory Of Private Storm Water Facilities: Upon adoption of this <br />Chapter, the City Engineer shall inventory and maintain a data basis for all private <br />storm water facilities requiring maintenance to assure compliance with this <br />Section. <br /> <br />SECTION 2. Effective Date. This ordinance shall take effect from and after its <br />passage and publication. <br /> <br />PASSED by the City Council of the City of Roseville, this _ day of <br />,2000. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.