Laserfiche WebLink
<br />..J UL - C;J-:L "::J';f;J :L ~ ; 1010 <br /> <br />LilY ur ~iNN~IUNKH <br /> <br />612939 8244 <br />L.V,'t..'tu Vf'\UII"1'\I...~t: <br />SECTION 300.27 <br />PAGE 200 <br /> <br />P. 13/16 <br /> <br />d) locatjon~ approximate size and common name of existing trees and shrubs; <br /> <br />e) a planting schedule containing symbols. quantities. common and botanical names. size <br />of plant materiaJs, root condition and special planting instructions; <br /> <br />t) planting details iI1ustrating proposed locations of aJ) 'new plant material; <br /> <br />g) locations and details of other landscape features incJuding berms, fences and pbnter <br />boxes; <br /> <br />h) details of restoration of disturbed areas including areas to be sodded or seeded; <br /> <br />j) location and details of irrigation systems; and <br /> <br />j) details and cross sections of all required screening. <br /> <br />SUBDIVISION 15. MINIMUM LANDSCAPING REQUIREMENTS. <br /> <br />, - <br />a) All open areas of a lot which are not used or improved for required parking areas, <br />drives or storage shall be landscaped with a combination of overstory treeS. <br />understory trees, shrubs, flowers and ground cover materials. The plan for <br />landscaping shall include ground cover, bushes, shrubbery, trees, scuIpmre, <br />foundations. decorative walks or other similar site design features or materials in a <br />quantity having a minimum value in conformance with the ,following table: <br /> <br />PROJEer VALUE <br />INCLUDING BUILDING CONSfRUCTION, <br />SITE PREPARATION, AND SITE IMPROVEMENTS <br /> <br />MINIMuM <br />LANDSCAPE VALUE <br /> <br />Below $1.000,000 <br /> <br />- <br /> <br />2% <br /> <br />$1,000.001 - $2,000,000 <br /> <br />- <br /> <br />$20,000 + 1 % of <br />Project Value in <br />excess of <br />$1,000,000 <br /> <br />$2,000,001 - ~3,OOO,OOO <br /> <br />- <br /> <br />$30,000 + 0.75 % <br />of Project Value <br />in excess of <br />$2,000,000 <br /> <br />. <br /> <br />$3,000,001 - $4,000,000 <br /> <br />- <br /> <br />$37,500 + 0.25 % <br />of Project Value <br />in excess of <br />$3,000,000 <br /> <br />OveI' $4,000,000 <br /> <br />- <br /> <br />1% <br /> <br />( <br />