My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03179
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3100
>
pf_03179
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:52:42 PM
Creation date
12/8/2004 3:58:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />December 14, 1999 <br /> <br />Larry E. Holmes <br />1821 Dale Court <br />Roseville, MN 55113 <br /> <br />You are cordially invited to attend the Roseville Development Review Committee's <br />(DRC) Setback Permit Hearing on Tuesday, December 28, at approximately 3:30 p.m. in <br />the Rosevil/e Ciiy Hail Community Development Conference Room. <br /> <br />Brian Olson, 1820 Dale Court, has petitioned for a Setback Permit to allow the <br />completion of a three-season porch to within 22 feet of the property line or an <br />encroachment eight (8) feet into the required 30 foot rear yard setback. <br /> <br />During a routine inspection, the City Inspector noticed that footings for the porch <br />addition did not meet the required code. After reviewing the approved plans and <br />discussing the matter with the builder and owner, it was determined the 30 foot rear yard <br />setback issue was not closely monitored. <br /> <br />The Setback Permit process allows adjacent property owners the opportunity to comment <br />on the proposal in writing or affords them time to comment at the hearing. Should you <br />have any comments or questions about this particular Setback Permit application, please <br />feel free to attend the meeting on Tuesday, December 28 or provide them to my attention. <br />My direct number is 651-490-2236. <br /> <br />If a decision to approve the request is made, the building permit will be noted as such <br />after the 10 day appeal time line has passed. <br /> <br /> <br />omas Paschke <br />CITY PLANNER <br />CITY of ROSEVILLE <br /> <br />Attachments: application and site plans. <br /> <br />Q:\Planning Files\3 178_01son, Brian SB\Resident Notice Dec 28.doc <br /> <br />2660 Civic Center Drive .:. Roseville .:. Minnesota ,:.55113 <br />651-490-2200 .:. TDD 651-490-2207 <br />
The URL can be used to link to this page
Your browser does not support the video tag.