Laserfiche WebLink
<br />0412-1/00 <br /> <br />MON 1-1:38 FAX 6514825~32 <br /> <br />RAMSEY CO <br /> <br />PCBLI~MO!:' \ <br /> <br />l(jOOl <br /> <br />- <br />~ <br /> <br />RAMSEY COUNlY <br /> <br />Department of Public Works <br />Paul L. Kirkwold, P,E.. County Engineer <br />Da.niel G. Schacht, P.E.. Acting Director <br />ADMINISTRATION/LAND SURVEY <br />50 West Kellogg Blvd., Suite 910 <br />St Paul, MN 55102 · (651) 266-2600. fax 266-2615 <br />E-mail: Publie.works@co.rarnsey.mn.us <br /> <br />ENGINEEfUNG/OPERA TIONS <br />3377 N, Rice Street <br />Shoreview, MN G6126 <br />(651) 484-9104 · Fax 482-523~ <br /> <br />April 24, 2000 <br /> <br />Mr, Karl Keel, P.E. <br />Director of Public Works <br />City of Ros~vi1lc <br />2660 Civic Center Drive <br />RoseviUe, Minnesota 55) 13 <br /> <br />Dear Karl: <br /> <br />The RamseyCou1'lty Public Works Department is in the process of awarding a contract and <br />beginning consttuction ofL3.rPenteur Avenue between Arona Street and Oxford Street, Part of <br />that project includes removing the stockpi led concrete 111 the Kent Street Yard north of <br />Larpenteur A venue, <br /> <br />In February of this year the City of Rosevi lie initiated an interim use permit application to allow <br />Ramsey County to crush and reuse that existing concrete. The crushed concrete would then be <br />lIsed as aggregate base on this surruners Larpenteur Avenue construction project. An interim use <br />permit for this operation was previously denied in 1998 and tab1cd in March 2000 pending J <br />discussion of cost s~vings resulting from the crushing operatiom. <br /> <br />Based on ollr current contract provisions and based on using on]y the existing stockpiled concrete <br />fOT aggregate base it is unJ1kely that crushing at the Kent Street Yard would result in any direct <br />cost savings. Because of this fact and because of past controversy surrounding the ur-;e of this site <br />for crushing the County is not requesting to use the Kent Street Yard for these operations. The <br />existing. s~ockpile of ~ohcrete will be removed. <br /> <br />, . .Th~nks for y.our-past cooperation and assistance on this project. If you need- any additionai <br />information please !;ve me a ca.ll. <br /> <br />Sinccrely,_ <br /> <br />~~)L <br /> <br />Daniel E. Soler, P.E. <br />,Project Manager - Larpenleur Avenue <br /> <br />- cc; ~.9rrunissioner Jan Wiessner <br /> <br />Mbuaesota's First Rome Rule Count;y <br />~r!nIM Oft "'i'I'Mad i>iJ'I!r W1th' mInimum of I~ !ICOl~"nPDm~r <"',"~I'i'l <br />~ <br />