Laserfiche WebLink
<br />(vp 041900) <br /> <br />SIGN APPROVALS <br /> <br />1. Tenant shall submit drawings and specifications including samples of <br />materials and colors, for all its proposed sign work to the Tenant Coordinator <br />of Kraus-Anderson, Incorporated. Three (3) sets of drawings will be required <br />by the Tenant Coordinator. The drawings shall clearly show location of sign <br />on the elevations, graphics and color. Neon letters should also show <br />construction and attachment details. <br /> <br />2. The Tenant Coordinator shall return one (1) set of sign drawings, as soon as <br />possible, to the Tenant. The drawings will be marked either "Approved", <br />"Approved Based on Landlord's Modifications" or "Disapproved". Sign <br />drawings that have been "Approved Based on Landlord's Modifications" are <br />to be returned to the Tenant Coordinator bearing Tenant's approval, or are to <br />be redesigned and resubmitted for Landlord's approval within seven (7) days <br />of receipt by Tenant. Sign drawings that have been disapproved are to be <br />redesigned and resubmitted,tothe Tenant Coordinator for approval also <br />within seven (7) days of receipt by Tenant. <br /> <br />7 <br />