Laserfiche WebLink
<br />, .' <br /> <br />., <br /> <br />City of Rose vi lIe <br /> <br />Costs to upgrade Cleveland Lift Station pumps to 400 gpm <br /> <br />PUMP # 1 <br />Labor <br />12 man hours @ $36.66/hour <br /> <br />Equipment <br />#206 6 hours @ $13.7 5/hour <br />#1283 hours @ $35.00/hour <br /> <br />Hired Labor to replace impeller <br />Total <br /> <br />PUMP #2 <br />Labor <br />12 man hours @ $36.66/hour <br /> <br />Equipment <br />#2066 hours @ $13.75/hour <br />#1283 hours @ $35.00/hour <br /> <br />Hired Labor to replace impeller <br />Total <br /> <br />GRAND TOTAL <br /> <br />$ 439.92 <br /> <br />82.50 <br />105.00 <br /> <br />150.00 <br />$ 777.42 <br /> <br />$ 439.92 <br /> <br />82.50 <br />105.00 <br /> <br />150.00 <br />$ 777.42 <br /> <br />$1,554.85 <br />