Laserfiche WebLink
<br />REQUEST FOR CITY COUNCIL DISCUSSION/DIRECTION <br />DATE: 5/15/00 <br />ITEM NO: <br />Department Approval: Manager Approval: Agenda Section: <br />~/c.;5. <br />Item Description: Request for tax increment assistance - 2655 Fairview Ave. <br />(PF3216) <br /> <br />1.0 Background: <br /> <br />1.1 The City has received a request for pay-as-you-go tax increment assistance for the <br />redevelopment of the Southern portion of2655 Fairview Avenue. The site, formally <br />occupied by Thermo King includes a vacant dilapidated building in need of demolition. <br />Ryan Construction has brought a request forward, for their client Wheeler Hardware. <br /> <br />1.2 Wheeler Hardware is a 50-year-old local wholesale door and hardware distributor to the <br />commercial industry. Wheeler currently is located in Shoreview with 13,000 SF of <br />manufacturing space and St. Paul with 4,400 SF of office and warehouse space. The new <br />site will consolidate their operation under one roof and allow for significant growth of the <br />company. <br /> <br />1.3 Wheeler currently employs 26 people and will hire at least 5 new employees within the <br />first year. Wheeler was unable to find a suitable site in St. Paul that would meet their <br />needs for expansion and felt that Shoreview was too far from their existing customer and <br />employee base. <br /> <br />1.4 The proposed site in Roseville consists of approximately 3.57 acres. The site is "L" <br />shaped and includes an abandoned industrial building owned by Pacific Mutual Door. <br />The larger Pacific Mutual Door building is currently being sold separately. The entire <br />site is in the existing tax increment redevelopment district # 16, which expires in 2018. <br /> <br />1.5 The proposed redevelopment would result in the demolition of the existing building and <br />the new construction of a 35,000 SF manufacturing, office and warehouse facility on the <br />back side of the site. The redevelopment will require the addition of a storm water pond <br />due to the added impervious surface. <br /> <br />1.6 At this time it is anticipated that the proposal will meet the existing land use criteria for <br />an I-I zone and that no variance or conditional use permits will be required. Building <br />plans have not been submitted at this time. <br /> <br />1. 7 Based upon preliminary information provided by RJ Ryan Construction, staff prepared a <br />preliminary tax increment spreadsheet. The current tax capacity for the existing site is <br />approximately $10,052 annually. With an estimated new value of $1 million, new <br />annual increment amounts to approximately $15,600 annually. After fiscal disparities <br />and a 25% administrative fee it is estimated that there could be a total of $70,000 in tax <br /> <br />RCD(PF3216) - Redevelop C2/Partridge - Page 1 of2 <br />