Laserfiche WebLink
<br />The proposed building would have an eave height of approximately 23' and would be <br />constructed of an exposed aggregate precast concrete. Precast concrete is an ideal <br />product for facilities of this type. The exposed aggregate finish requires no maintenance. <br /> <br />R.J. Ryan Construction, Inc., is requesting the City of Roseville provide tax increment <br />financing to cover the cost of the demolition of the existing building on the site as well as <br />construction of the retention pond and extension of utilities which will be required by the <br />new facility. Although it is believed that the site is clear of environmental problems, if <br />contaminants are found, we would request that the city also provide assistance in cleaning <br />up the site. The construction of this facility cannot proceed without financing assistance. <br />The cost of the land is high and the irregular shape makes it impossible to make efficient <br />use of the entire parcel. The site is further encumbered by the existing building and costs <br />associated with utility infrastructure required and storm water from retention pond. <br /> <br />Sincerely, <br /> <br />" .J. RYAN CONS RUCTION, INC. <br /> <br /> <br />TR:jv <br />Wheeler-let03 <br />