Laserfiche WebLink
<br />-- <br /> <br />Mil <br /> <br />Northern States Power Company <br /> <br />414 Nicollet Mall <br />Minneapolis, Minnesota 55401-1993 <br />Telephone (612) 330-5500 <br /> <br />November 17, 1999 <br /> <br />",;."'ji;~;Th <br /> <br />, ~... : <br />~,.,,0\ <br /> <br />f\r\ <br />.' '" 1,::J'j~ <br />\ t\ \;;! <br /> <br />Thomas E Shamp <br />Caison-LaVine Inc. <br />2833 Aldrich Avenue South <br />Minneapolis, Minnesota 55408 <br /> <br />. .--" <br /> <br />\, r'~ (n <br /> <br />.. . <br /> <br />r-~ 'f"'nl"'\ ^ f"'U~ ~r.::"!'" P~rll;"""" I "'~ 00r-J:: D~rt~id"Q 0",,,,-4 <br />c:.i ,,\...frI.Vnvl IIVIL-I 'I I .- I a. r\'il'~ 1-vt -€-'vVv I a La. ~_. ,,,",!.Au <br /> <br />Line 0803 <br />Section 05,Township 030, Range 25 <br />County: <br /> <br />Dear Mr. Shamp: <br /> <br />Our Transmission Engineers have reviewed the parking lot encroachment. The <br />encroachment is acceptable to NSP under the following conditions: <br /> <br />(1) Excavation close to structure location. <br /> <br />A minimum distance of 10 feet of supported earth must be maintained from <br />any part of the line structure. Support of the ground beyond the 10 feet may <br />be provided by a slope no greater than three feet horizontal to one foot <br />vertical. Support may also be provided by the use of cribbing, sheet piling, <br />retaining wall or tunneling. The specific plan for providing the required <br />support and the excavation plan for the proposed project must be submitted <br />to NSP for review and approval. <br /> <br />(2) Grade change around structure location. <br /> <br />The grade around the structures must provide for surface water runoff - no <br />surface water ponding around structures will be permitted. Any cost related <br />to the adjustment of NSP's facilities will be at the requestors expense. The <br />fill around the wood poles should be removed to an elevation of 2 feet above <br />adjacent curb. . <br /> <br />(3) Grade change within easement. <br />Stockpiling of soil and/or material within the easement will not be permitted. <br />(4) Clearances to equipment. <br /> <br />A working clearance of 20 feet between the electrical and any cranes or <br />digging equipment used in or near the easement, must be maintained at all <br />times. If this clearance cannot be maintained, the contractor or developer <br /> <br />\ <br />