My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03243
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3200
>
pf_03243
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 1:10:43 PM
Creation date
12/9/2004 6:58:20 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1788
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />4.0 Areas Requiring Special Attention <br /> <br />The following areas containing friable ACM re9uire, in our <br />opinion, special attention because they are e1ther damaged, <br />accessible to damage or in their present condition represent <br />a significant potential for asbestos fiber release and <br />subsequent human exposure. <br /> <br />4.1 Boiler Room and Tunnels (Figure 1) <br /> <br />The aSbestos-containing fittings have isolated damage in <br />the boiler room and tunnels. The water heatin9 tank also <br />has isolated damage. Exposed asbestos insulat10n creates <br />the ~otential for fibers to become airborne. Damaged <br />fitt1ngs and tank insulation should either be repaired or <br />removed and replaced with nonasbestos insulation. <br /> <br />4.2 Throughout the Facility (Figure 3) <br /> <br />9" x 9" floor tiles cover the majority of the facility. <br />Some areas have carpeting over the floor tiles. These <br />tiles are brittle and there is isolated damaged in a <br />variety of areas. The floor tile need not be removed <br />until demolition of the building. <br /> <br />5.0 COST ESTIMATES FOR REMOVAL <br /> 1. Thermal Fittings Insulation = $ 3,000.00 <br /> 2. Thermal Pipe Insulation = $ 85.00 <br /> 2. Thermal Water Heater Insulation = $ 1,200.00 <br /> 3. Floor Tile = $ 11,250.00 <br /> 4. Reinsulation/Retiling = $ 11,000.00 <br /> 5. Contractor Supervision = $ 3,500.00 <br /> and Air Monitoring <br /> Total = $ 30,035.00 <br /> <br />Repair of the damaged insulation would be a less costly <br />option. Small scale removal and repair of the damaged <br />asbestos-containing materials could be accomplished in two to <br />three days. An approximate cost estimate is $3,500. <br /> <br />HCR COMTEN ASBESTOS REPORT <br /> <br />PAGE 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.