<br /> <br />October 11, 2000 <br /> <br />To: Steve Sarkozy, City Manager <br /> <br />Introduction <br /> <br />Enclosed is a draft of the Preliminary Capital Improvement Program for the 5-year period of2001-2005. <br /> <br />The current proposed year (200 I) is contained within the proposed 200 I operating budget. The years of 2002-2005 are the best <br />estimates as viewed by City staff with input from the Council, various commissions and other city workgroups. In a number of <br />cases the items may have a bit of a wish list in them and do require further analysis prior to coming to the Council for approvals. <br />There may also be projects we may have missed and should be included. <br /> <br />The Capital Improvement Plan, with exception of the proposed 2001, is for planning purposes only and the compilation of <br />improvements and equipment does not constitute an approval by Council or an authorization to implement. The 200 I year is part <br />of the proposed budget and once approval by the Council; the implementation process may begin on those designated <br />improvements and equipment procurement <br /> <br />Purpose of Plan <br /> <br />The intent of preparing a 5- Year Capital Improvement Program meets a number of objectives: <br /> <br />. It identifies both short-term and long-term operating and capital needs of the city. <br /> <br />. The plan enables the City to manage growth and redevelopment without putting taxpayers at risk as well as identifying <br />specific needs which may need referendum approval. <br /> <br />. A framework is provided for replacing city assets such as streets, public buildings, utilities and parks. <br /> <br />. Enables the council to visualize the competing needs in a context of the financial options which may exist. <br /> <br />Hil!:hlil!:hts <br /> <br />This draft provides for total improvements of $74,152,000 and equipment replacement of$7,165,975 over the 5-year period. The <br />estimated total of both improvements and equipment replacement of $81 ,317,975 is $12,428,272 less than the current 5-year <br />projected period of 2000-2004. The major difference is in the projected building replacement estimates. This Report estimate <br />reflects a less ambitious program of facilities replacement than what was discussed last year. <br /> <br />Key elements within the proposed improvements include a continuing effort in maintaining the city streets, storm system, parks <br />and other basic infrastructure. Community Development efforts include a major re-development effort in the Twin Lakes area of <br />the City. A substantial portion of the funding for this will depend on grants from either the State or Federal sources. <br /> <br />The past 3 years has seen Park development of nearly $8 million. This report provides for completion of some of those projects <br />as well as additional potential referendum-based improvements such as the activity center replacement. <br /> <br />The Centre City program of improvement in general governmental buildings especially for improved public safety space, is also <br />outlined this report at a somewhat modest level of$5.6 million. This improvement would also need to be referendum-based. <br /> <br />Conclusion <br /> <br />We will be prepared to discuss this proposed plan, as well as any additional ideas or suggestions the Council may have at the <br />October 16, 2000 work session. <br /> <br />Respectfully submitted <br /> <br />i:tf~ce Director <br /> <br />2660 Civic Center Drive .:. Roseville .:. Minnesota .:. 55113 <br />651-490-2200 .:. TDD 651-490-2207 <br />