My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03283
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3200
>
pf_03283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2012 12:40:36 PM
Creation date
12/9/2004 7:01:59 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3283
Planning Files - Type
Planned Unit Development
Project Name
Centre Pointe
Applicant
Ryan
Status
Approved
Date Final City Council Action
3/26/2001
Planning Files - Ordinance #
1249
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Prior to 1985, land use on the Centre Pointe Business Park site included single- <br />family homes along the west and northeast portions, a gas station near the <br />intersection of Cleveland and County Road D, agricultural lands throughout much <br />of the site and Garrett Trucking Company at the southern extreme. The remainder <br />of the site was used for agricultural purposes or maintained as a natural habitat <br />and had never been developed. <br /> <br />The above-described structures were removed as part of the initial phase of the <br />1985 development plan (Figure 5). Since that time, the entire site has been <br />graded, Centre Pointe Drive and Lydia Avenue were constructed, 8 stormwater <br />ponds and storm sewer were constructed, a paved trail system was constructed, <br />utilities (sanitary sewer and municipal water) were provided to accommodate full <br />development of the property, and 2 buildings with associated parking lots were <br />constructed on the site. The site is developed with the exception of the restaurant <br />pad site. The first phase building for Veritas is under construction on the 16 acre <br />site owned by Veritas, as well as the Courtyard by Marriott in another part of the <br />Business Park. Existing site conditions are shown in Figure 3. <br /> <br />Adjacent land uses include the Interstate 35-W right-of-way along the entire <br />westem property boundary, a gas station adjacent to and north of the site, single- <br />family homes directly east of Cleveland along the northern third, and industrial <br />uses along the remainder of the eastern property boundary. DNR Wetland 50W is <br />adjacent to and south of the subject property and DNR Wetland 203W is east of <br />the property across Cleveland Avenue (Figure 6). <br /> <br />The office, office-showroom, business hotel, and restaurant uses are compatible <br />with the existing and planned uses of the surrounding area. <br /> <br />All known environmental hazards associated with past use of the site have been <br />removed. Phase I and Phase II Environmental Assessments determined that "no <br />conditions were found to pose an environmental risk to the Property and that <br />further environmental assessment was unwarranted" (Delta Environmental <br />Consultants, Inc., 1994 - Appendix B). <br /> <br />The proposed development presents low potential for adverse environmental <br />impacts due to previous land uses. <br /> <br />10. <br /> <br />Cover Types: <br />Estimate the acreage of the site with each of the following cover types before <br />and after development (before and after totals should be equal): <br /> <br />Page to <br />
The URL can be used to link to this page
Your browser does not support the video tag.