Laserfiche WebLink
<br />1 <br />2 <br />3 <br />4 <br />5, <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br /> <br />Kent Carlson explained the detail of the new request, noting the change from two floors <br />to four floor buildings, more green space and a better parking ramp. <br /> <br />Member Cunningham asked what the maximum height (in stories) that the new buildings <br />could be expanded to (4 stories). <br /> <br />Member Rhody asked whether two or four stories of parking would ultimately be needed. <br />Kent Carlson explained the buildings are not densely used; the people per 1000 s.f. of <br />space is lower at four or 3.5 people per 1,000 s.f.. A two-story ramp will be built; he <br />does not expect a four-story ramp (A proof of parking condition in the PUD). <br /> <br />There were no public comments. Chair Klausing closed the hearing. <br /> <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br /> <br />The Planning Commission (at the March 14th Planning Commission meeting will review <br />the EA Wand comments. <br /> <br />Chair Klausing explained he wished more comment and detail on the traffic impacts. <br /> <br />~~ber Klausing moved, second by Member Cunningham, to find that the <br />an uses proposed within the Veritas amendment (122,000 s.f. of additional office space) <br />to the existing Planned Unit Development to be consistent with the Comprehensive Plan <br />and t4e intent of the 1997 Centre Pointe PUD. <br /> <br />Ayes: 5 <br />Nays: 0 <br />Motion carried. <br /> <br />~~ember Klausing moved, second by Member Cunningham, to establish a <br />meetmg date of March 14,2001 when the Planning Commission final recommendation <br />will be made based on Planning Commission review of the final EA Wand comments and <br />mitigation plans of any environmental impacts discovered through the EA W process. <br /> <br />Ayes: 5 <br />Nays: 0 <br />Motion carried. <br /> <br />d. Plannine File 3279: A request by the Robert Witt for a variance from the <br />Section 1016 (Shoreland, Wetland, and Stonn Water Management) to the <br />construction a 1,576 square foot walkout rambler with attached garage on <br />property located at 353 South Owasso Boulevard. The specific variances are: to <br />locate the structure within the required 75 foot shoreland setback; allow a greater <br />impervious area than the required 25%; and a 23 foot v~riance from Section <br />1004.02D (Minimum Yard Requirements) to allow a pre-existing detached <br />garage to be located in the required front yard. <br /> <br />Chairman Craig Klausing opened the public hearing and requested City Planner Thomas <br />Paschke to provide a verbal summary of the project report dated January 10,2001. <br /> <br />Thomas Paschke explained the details of the site development and the history of the site. <br />The structure is not modem and does not meet current Codes. The parcel is six feet lower <br /> <br />Page 6 of 11 <br /> <br />------------ <br />