My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03284
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3200
>
pf_03284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2007 10:04:24 AM
Creation date
12/9/2004 7:03:16 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3284
Planning Files - Type
Conditional Use Permit
Address
2233 HAMLINE AVE N
Applicant
Voicestream
Status
Approved
Date Final City Council Action
1/22/2001
Planning Files - Resolution #
9860
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />A. The proposed antenna units and equipment cabinet will not create additional <br />traffic nor the need for additional public facilities. <br /> <br />B. The antenna units cannot be effectively screened given their proposed size and <br />location, as well as creating a disruption of use. However, the equipment cabinet <br />must be designed in a manner to be consistent with the adjacent penthouse. When <br />complete, neither the antenna units nor the equipment cabinet will have an impact <br />on surrounding property or values. <br /> <br />C. There appears to be no impact on general health, safety, and public welfare. <br /> <br />D. The project complies with the Comprehensive Plan designation as a business use. <br /> <br />WHEREAS, on January 10,2001, the Roseville Planning Commission held the public <br />hearing regarding the ATP Minneapolis request and voted (5-0) to recommend approval of the <br />conditional use permit, subject to the following conditions: <br /> <br />1. The maximum height of the antenna support units and antenna located in the <br />southwest and southeast building comers and north side of the building, upon full <br />installation, shall be eight feet above the roof height. <br /> <br />2. The maximum height of the equipment platform and cabinets, upon full installation, <br />shall be eight feet above the roof height. <br /> <br />3. The A TP request, on behalf of V oiceStream, shall be limited to three antenna support <br />units, each having a maximum of four antennas. <br /> <br />4. The equipment platform shall be limited to six equipment cabinets. Five will be 30 <br />inches wide by 40 inches deep by 5 feet tall and one cabinet will be 2 feet wide by 2 <br />feet deep by 5 feet tall. <br /> <br />5. The antenna support units and equipment cabinets shall be limited to the single user <br />(V oiceStream) and the applicant A TP Minneapolis. Future antenna additions will <br />require a revised CUP. <br /> <br />6. The antenna units and equipment cabinets shall not be lighted. Electric and phone <br />wires serving the equipment and antenna units shall be mounted to the building roof. <br /> <br />7. The antenna units, equipment platform, and supporting cabinets shall be completely <br />removed from the site by the applicant (A TP Minneapolis) after operations cease, or <br />if the equipment is damaged or unsafe as determined by the Roseville Building <br />Official, or if the CUP lapses or if the use is determined to be in violation of the CUP <br />or City Code by the Community Development Director. The City may require the <br />applicant (ATP Minneapolis) to post a bond to assure timely removal of the antenna <br />units and supporting equipment. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.