My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03284
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3200
>
pf_03284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2007 10:04:24 AM
Creation date
12/9/2004 7:03:16 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3284
Planning Files - Type
Conditional Use Permit
Address
2233 HAMLINE AVE N
Applicant
Voicestream
Status
Approved
Date Final City Council Action
1/22/2001
Planning Files - Resolution #
9860
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Memorandum <br /> <br />DaIs 12111/00 <br />TO!: Steve Katkov, Real Estate and Zoning Manager, American Portable TeIeccm(APT) <br />Cc: Alan Roberts, RF Engineering Manager, APT <br />From: Brandon Johnson, RF Engineer, APT <br />HE: Site Justification for Roseville South- A 1 N517 <br /> <br />As the Radio Frequency Engineer assigned to design and analyze the proposed tower in Roseville, <br />MN, I have performed evaluations considering the follO'Mng factors: tower height, terrain, foliage, and <br />coverage connectivity with existing sites. All of the previously mentioned factors are important in the <br />design process. Before a particular location is chosen as the area where v.e wish to build, v.e first look <br />for any existing structures (i.e. rooftops, existing tDY.ers, ate.) that meet our coverage objectives and <br />that are available for co-4ocation. In this particular case, an existing sIructure was identified and <br />designated as our primary candidate for this particular search ring. <br /> <br />The proposed site, which will be located on the roof of the Roseville Professional Center, will enable <br />APT to provide optimal coverage in Roseville and provide in- building coverage to the malls, <br />businesses and residential neighbort1oods sulTOUnding Highways 36 and 51. Our proposed tcM'er will <br />fix the 'Neak in- building coverage that exists in this particular area and solve the capacity issues v.e are <br />currently experiencing in this area due to high customer usage. <br /> <br />The frequencies used will be restricted to the PCS B Band as follows: <br /> <br />Receive: <br /> <br />PCS B Block (1950 to 1965 MHz) <br />PCS B Block (1870 to 1885 MHz) <br /> <br />Transmit <br /> <br />This band was allocated to APT by the FCC. These frequencies are well isolated from other <br />frequencies used by public safety communications systems. We currently have over 250 sites on the <br />air, and no incidences of interference with public safety systems has ever occurred. <br /> <br />8118/00 <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.