Laserfiche WebLink
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: October 28, 2014 Item No: 4 <br />Item Description: Communication Items <br />Projects update: <br />• 2014 PMP- We are nearing completion of this project. The remaining work includes <br />paving the final layer of pavement on Dellwood, some backyard drainage improvements <br />near Dellwood and Sherren, and directionally boring a new water main along Rice Street <br />to complete a link near Lake McCarrons. All work will be complete by the end of <br />October. <br />• County Road B2 Sidewalk Construction — We are proud to report all of the concrete has <br />been poured along this project. There may be some spot repairs to do yet, but the majority <br />of the remaining work now includes restoration work and roadway patching. With the <br />exception of minor punch list items, the project should be complete by the end of <br />October. The City has already received several positive comments from residents about <br />the new sidewalk. <br />• Snelling Ave Bus Rapid Transit: This project is still on schedule for a 2015 construction <br />timeline with actual bus operations beginning in the end of 2015. On a related note, staff <br />is starting to work with Metro Transit on a project to study the extension of the BRT line <br />north of Rosedale. More information will be available on this in early 2015. <br />• Victoria Street Reconstruction and Sidewalk Project: Staff is starting preliminary work <br />on next year's reconstruct project along Victoria Street south of County Road B. This <br />project will involve complete reconstruction of the roadway, curb and gutter installation <br />at various points, storm water improvements, as well as a new pathway. The pathway will <br />extend north and tie into the new sidewalk at County Road B2. The City is working with <br />the County and their expected mill and overlay project on Victoria north of County Road <br />B to possibly narrow the roadway to make room for the sidewalk on the east side of the <br />roadway. On October 7t' staff met with about 20 residents that live along Victoria Street <br />to review the preliminary details of the project and answer any questions the residents <br />had at this point. We will meet with the neighborhood again this winter when the plans <br />are further along. <br />• An update on upcoming Mn/DOT projects will be presented to the PWETC as a separate <br />item during this meeting, including more details on the replacement of the TH 36 bridge <br />over Lexington Ave. <br />Maintenance Activity: <br />• Street maintenance staff is performing fall mowing of boulevards and preparing <br />streetscape areas for winter. <br />• Final seasonal street maintenance activities continue with general patching operations and <br />curb and sidewalk repairs. <br />