Laserfiche WebLink
<br />service and new back up generators are located primarily on the southeast <br />east and north sides - remnants of earlier uses. The final PUD document will <br />require the developer to bring the building and parking areas into compliance <br />with current land use design standards as the building uses change, but to be <br />completed in ten years or less. <br /> <br />2.9 The proponents note that there is adequate water and sewer capacity on the site. <br />Storm water uses existing catch basins and will be treated in infiltration areas and the <br />Fulham ponds before it reaches the wetlands areas, in a method consistent with <br />previously approved plans by the Rice Creek Watershed. No new imperious surface <br />is proposed; no new ponding is required. <br /> <br />2.10 Because of the nature of the request inside of an existing building, Meritex <br />has submitted a unique set of building concept development plans, including <br />site, floor plan, and building elevations. These plans are being reviewed by <br />the City building and fire prevention staff for property building and life safety <br />standards and use separations. More detail regarding site, deck entry, and <br />playground submittals, consistent with city design standards, will be required <br />as part of the final PUD and building permit approvals. <br /> <br />Planned Unit Development Uses within Hil!hcrest <br /> <br />Use/Tenant Size in S.F. Location Parking Employees Students <br />Multek 134,000 NW, floor 1 224 300 0 <br />Telecommunications 19,845 Center, floor 1 20 6 0 <br />Unisvs 85,571 NE, floor 1 250 300 0 <br />Honevwell 25,000 SE, floor 1 27 6 0 <br />MN Social Services 53,000 SW, floor 2 200 180 0 <br />School 50,000 SW, floor 1 26 25 550 maximum <br />Others 23,000 Varies 75 75 0 <br /> <br />2.11 Based on the applicant's occupancy deadlines for school and other <br />operations, as well as the construction schedule for completion in late <br />summer, 2001, the applicant has requested an expedited schedule with <br />tentative hearing and action schedule for this project is as follows: <br /> <br />05/09/01 Planning Commission hearing and action on CONCEPT plan. <br />OS/21/01 City Council action on CONCEPT plan; first reading of Ordinance. <br />06/11/01 City Council hearing and action on FINAL development plan, <br />FINAL PUD Agreement, and second (final) reading of Ordinance. <br /> <br />3.0 COMPREHENSIVE PLAN and ZONING IMPLICATIONS: <br /> <br />3.1 The City of Roseville Comprehensive Plan (the future look) designates the <br />entire Highcrest Business Park development as an industrial area. No specific <br />maximum square footage is stipulated or required in the Plan. The guiding <br />policy document is the City of Roseville Planning District #10, the Industrial <br />Goals in Section 3, and the Zoning Map and Section 1007 and 1008 of the <br />City Code. Section 1008 of the City Code outlines the requirements and <br />procedures for a planned unit development. (These documents are attached). <br /> <br />PF3301 RPCA (050901) - Page 4 of9 <br />