Laserfiche WebLink
<br />Emission Test Report <br /> <br />EMC ~:~~~~ Tl <br /> <br />Revision: 0 <br />Date: September 30.1999 <br />Page 2 of 2 <br /> <br />water (Le., not a caustic or acidic solution). Water spray nozzles are located across the top I <br />of the cylinder, and drains remove water from the bottom of the cylinder. <br /> <br />A temporary platform was erected which ran alongside the scrubber to allow for I <br />sampling at the scrubber inlet and outl~t. The scrubber inlet was sampled in the 72-inch <br />long horizontal circular duct leading into the scrubber. The scrubber outlet was sampled in <br />the 3D-inch long horizontal circular duct connected directly to the scrubber. This was a <br />temporary duct installed to replace the original duct for the test. The number of traverse <br />points and sampling time at each point was identical for both inlet and outlet locations. <br /> <br />Chimney <br /> <br />Scrubber <br /> <br /> <br />:] <br />W <br /> <br />Charging <br />Door <br /> <br /> <br /> <br />r~I~1 <br /> <br />J <br /> <br />...... <br />w <br />,- <br />12" <br />OJ <br /> <br />InleVOutlet <br />Sampling Locations <br /> <br />J <br />I. ".)" <br />t'j <br />n,: <br />tJ <br /> <br />0) <br />.- Primary Chamber <br />...... <br />...... <br />:: <br /> <br />Secondary <br />Chamber <br /> <br />Wall <br /> <br />Retort <br /> <br />I. <br /> <br /> CD <br /> Floor I FJ <br /> ' ' <br /> .1. .1 f"'" <br /> }...:..J <br />15'-0" 7'-0" <br /> <br />Figure 2-1. Cremation Incinerator Unit <br /> <br />MRI-AED\R4951-QS-OJ S2.wpd <br />