My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03315
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3300
>
pf_03315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2007 12:15:24 PM
Creation date
12/9/2004 7:24:20 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3315
Planning Files - Type
Conditional Use Permit
Address
803 LARPENTEUR AVE W
Applicant
Roselawn Cemetery
Status
Denied
Date Final City Council Action
8/27/2001
Planning Files - Resolution #
9927
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AUG-01-2001 12:18 <br /> <br /> <br />INDUSTRIAL EQUIPMENT <br /> <br />fiE? <br /> <br />407 885 5990 P.05/12 <br /> <br />Control Equipment <br /> <br />Combustion gas passes through a wet scrobber prior to entering the chimney. Entrained <br />particulate matter and other pollutants exiting the secondary combustion chamber are removed in <br />the scrubber. The horizontal. cylindrical, stainJess steel scrubber unit is approximately 48 inches <br />long with a 36-inch diameter and uses unmodified city water (i.e., not a caustic or acidic <br />solution). Water spray nozzles are located across the top ofthe cylinder, and drains remove <br />water fTom the bottom of the cylinder. <br /> <br />A temporary platform was erected which ran alongside the scrubber to allow for sampling at the <br />scrubber inlet and outlet. The scrubber inlet was sampled in the 72-inch long horizontal circular <br />duct leading into the scrubber. The scrubber outlet was sampled in the 30-inch long Jtorizonta) <br />circular duct connected directly to the scrubber This was temporary duct installed to!rePlace the <br />original duct for the test. The number of traverse points sampling time at each point was <br />identical for both inlet and outlet locations_ <br /> <br />Chimney <br /> <br /> Charging <br /> Door <br />.... <br />~ <br />. 12" <br />~ <br /> C2 <br /> . <br /> ... <br /> -a. <br /> :z <br /> <br /> <br />Inlet/Outlet <br />Sampling Locations - <br /> <br />Scrubber <br /> <br /> <br /> <br />Secondary <br />Chamber <br /> <br />Primary Chamber <br /> <br />Wall <br /> <br />Retort <br /> <br />Roor <br /> <br />i <br />4 <br /> <br />I. <br /> <br />.11 <br /> <br />7' ..(f' <br /> <br />15'-0"" <br /> <br />Figure 2-1. Cremation Incinerator Unit <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.