Laserfiche WebLink
<br />D. There appears to be no impact on general health, safety, and public welfare. <br />Forest Lawn Cemetery, 1800 Edgerton Street, Maplewood, has the only other <br />crematory in close proximity to this site. <br /> <br />E. The project complies with the Comprehensive Plan designation (via the CUP <br />process) as a Cemetery use. <br /> <br />4.3 Conditions may be attached to the CUP that would mitigate the impact on adjacent <br />properties including such items as increased setbacks from property lines, landscape <br />screening, architectural color and design/materials details, drainage provisions, and <br />limiting additional exterior storage. <br /> <br />5.0 POLICY & FISCAL IMPLICATION <br /> <br />5.1 The crematory is a vital part and traditional landmark within the community. <br /> <br />6.0 STAFF FINDINGS (May be used as conditions of approval) <br /> <br />6.1 The crematory structure must not exceed 30 feet in height above grade (R-1 building <br />height limit). <br /> <br />6.2 The structure must be screened from Victoria Street and Larpenteur A venue with <br />landscaping, fencing, or a combination thereof. A plan must be submitted with the <br />building permit application and a landscape bond equal to 150% of the landscape cost is <br />required. <br /> <br />6.3 The structure must take on the exterior appearance and be built with materials similar to <br />that of the office and chapel structures. <br /> <br />6.4 A drainage plan must be submitted at the time of building permit application that <br />provides proper information on storm water run-off and management to the Engineering <br />Department for their review and approval. <br /> <br />6.5 The Crematory must meet all State and County building, health and emission, air quality <br />code/standards. <br /> <br />6.6 A revised site plan including dimensioned information must be submitted to the <br />Community Development Department for review and approval prior to building permit <br />issuance. Said plan must include parking stall width and depth, sidewalk and structure <br />dimensions. <br /> <br />6.7 Prior to issuance of a building permit, and within 60 days after approval of the <br />conditional use permit, the conditional use permit must be recorded with the Ramsey <br />County Recorder. <br /> <br />PF3315 RPCA (061301) - Page 3 of 4 <br />