My WebLink
|
Help
|
About
|
Sign Out
Home
2014-11-06_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2014
>
2014-11-06_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2014 4:33:29 PM
Creation date
10/30/2014 4:33:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ROSEVILLE <br />PARKS AND RECREATION RENEWAL PROGRAM <br />PROJECT PROGRESS REPORT <br />October 30, 2014 <br />PROJECT NAMESTART STATUSCOMMENTS <br />DATE <br />A.BUILDING <br />REPLACEMENT/SITE <br />Lexington Park 5/201485% complete Open HousePlannedfor <br />December, 2014 <br />Sandcastle Park 6/201475% complete Open House Plannedfor <br />December, 2014 <br />Villa Park6/201570% complete Open House Plannedfor <br />December, 2014 <br />Autumn Grove Park9/201415% complete,Open House Plannedfor <br />Framing begunJanuary, 2015 <br />Oasis Park 9/201410% complete Open House Plannedfor <br />January, 2015 <br />Rosebrook Park 9/20145% complete Open House Plannedfor <br />January, 2015 <br />B.SHELTER REMODEL <br />CP FOR Parks9/201485% completeFall completion planned <br />CP Foundation 9/201485% completeFall completion planned <br />CP Ballfields 9/201420% complete Fall completion planned <br />SKATING CENTER <br />C. <br />REPAIRS <br />Paintingof Exterior 8/2014100 % complete <br />Replace exterior doorson Arena Ordered To be installed fall/2014 <br />BlockWork Reviewing quotes-2015 <br />project <br />Vestibule Improvements Finalizing plans –2015 <br />project <br />D.HANC <br />Exterior Work 6/201490% completeOctober Completion <br />Interior Work 11/20142/2015 completion <br />Boardwalk 11/2014Spring 2015completion <br />E.BRIDGE REPLACEMENT <br />Villa Park 7/2014Fall 2014 installation <br />F.LIGHTING SYSTEMS <br />REPLACEMENT <br />Lake Bennett Trail 6/201495% complete <br />Courts in conjunction w/ projectSee courts <br />Autumn Grove Park rink lightsInstall fall 2014 <br />Lexington Park rink lights90% completeInstall fall 2014 <br />1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.