<br />5.6 In total, the Centre Pointe Business Park is estimated to generate 7,369 vehicle trips per <br />day, with approximately 900 trips per peak p.m. traffic hour (244 entering, 686 leaving <br />the site). The proponents state that no signalized intersection will have service <br />difficulties based on the proposed development, even with growth in the background <br />traffic by 2% per year. Only one intersection will change its level of service in the <br />future, the ramp from Cleveland Avenue onto 35W North will change from a service <br />level of"B" to a service level of"C", which is still functional. <br /> <br />5.7 Non-signalized intersections will continue to function as today, except the North Centre <br />Pointe Drive intersection with Cleveland Avenue, where cars will queue up in Centre <br />Pointe Drive while attempting to make a left turn to north bound Cleveland A venue. A <br />solution at this intersection could be a signaled intersection. Signalizing could also help <br />reduce straightway speeding along Cleveland Avenue. (The 1997 PUD and planning <br />process planned for a signal further south at Lydia and Cleveland in order to reduce <br />traffic noise and congestion close to residences and to provide a 4 way intersection into <br />the industrial/park area east of Cleveland. Staff and city traffic consultants will be <br />reviewing this issue during the EA W review and comment period.) <br /> <br />5.8 The proponents state that the 21,240 square feet of office area will have little negative <br />impact on the traffic and in fact will remain similar to past projections for the Business <br />Park, in part, because of the changing nature of the work force (more hi-tech than daily <br />retail restaurant users) and work hours. The proponents note that hi-tech workers tend to <br />work at different hours that a tradition 9 to 5 work day. <br /> <br />5.9 Existing noise levels have historically exceeded state noise standards for residential areas <br />near County Road "D" and Cleveland A venue. The added traffic from the proposal will <br />not significantly increase or decrease noise levels. However, construction noise may <br />have a temporary impact, but only during weekday daytime construction hours. <br />Construction for the building is estimated to take 12 to 14 months, during which noise <br />and construction dust will be managed to reduce impacts, as much as possible. <br /> <br />6.0 STAFF RECOMMENDATIONS: <br /> <br />6.1 The Development Review Committee (DRC) reviewed the proposed change in the <br />Master Site Plan, the proposed Solutia site plan, the proposed PUD Amendments, and the <br />draft EA W. The DRC concluded that the Master Site Plan designates the vacant parcel <br />as a restaurant site to serve the users of the Business Park. It is limited to 6,000 square <br />feet of building area and 82 off-street parking spaces. The proposed change in use is not <br />sensitive to the mixed-use nature of the Master Site Plan, and is not supportive or <br />complementary to the existing uses, both directly adjacent to the vacant parcel as well as <br />those throughout the business park. By not developing a restaurant on the site, it is <br />possible that more off-site employee vehicle trips will be generated, especially during the <br />lunch hours. <br /> <br />PF 3338 - RCA (10/22/01) - Page 6 of9 <br />