My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2014_1020
Roseville
>
City Council
>
City Council Meeting Minutes
>
201x
>
2014
>
CC_Minutes_2014_1020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2014 2:43:04 PM
Creation date
11/5/2014 2:41:50 PM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
10/20/2014
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regular City Council Meeting <br /> Monday, October 20, 2014 <br /> Page 3 <br /> Ms. Kauppi introduced the north area Engineer Mike Kruse, one of two MnDOT <br /> engineers in this area, with Mr. Kruse focused on the Highway 36 project. <br /> Presentation <br /> Ms. Kauppi reviewed 2015 construction projects, including County Road 96 de- <br /> tour, County Road F detour and County Road E detour; County Road E over <br /> Snelling Avenue for bridge replacement, and resurfacing the existing pavement <br /> from Selby Avenue to the Pierce-Butler Route, with replacement of the I-94 <br /> bridge deck, updated pedestrian crossings, improved drainage and construction of <br /> the bus rapid transit (BRT) stations along Snelling Avenue for Metropolitan <br /> Transit. Other projects included the Highway 36 at Lexington bridge replacement <br /> project, which Mr. Kruse would address in more detail later during this presenta- <br /> tion. <br /> Ms. Kauppi reviewed proposed 2016 construction projects, including County <br /> Road H detours, County Road E-2 detours, repaving of I-35W from Highway 36 <br /> to I-694, and the addition of auxiliary lanes on I-35W from E-2 to I-694; the E-2 <br /> bridge replacement over I-35W and auxiliary lane buffer on the northbound side; <br /> as well as the I-35W repaving project. <br /> Ms. Kauppi reviewed ongoing I-694 corridors of the commerce project to be <br /> completed during the 2016 construction season, including the addition of a gen- <br /> eral purpose lane between Rice Street and Lexington Avenue which had not orig- <br /> inally been planned. Ms. Kauppi clarified that the bridge at Rice Street would not <br /> be impacted, and would be a separate project with Ramsey County. <br /> At the request of Councilmember Etten, Ms. Kauppi reviewed the location of aux- <br /> iliary lanes along I-35W northbound from County Road E-w north to I-694 to cor- <br /> rect interchange shortcomings. <br /> Councilmember Etten expressed his appreciation for the additional north bound <br /> lanes,helping to clear the ramps on I-35W. <br /> MnDOT Engineer Mike Kruse <br /> As one of its designers, Mr. Kruse provided a more detailed overview of the <br /> Highway 36/Lexington Avenue bridge project for replacement of the existing <br /> bridge constructed in 1938, and reconstruction of the roadway and ramp pavement <br /> to improve the geometry of the intersection. Mr. Kruse noted that part of the pro- <br /> ject would include replacing the existing signal systems and adding a sidewalk on <br /> the east side of Lexington Avenue at the request of the City of Roseville, with a <br /> total project cost of$13.5 million. Mr. Kruse displayed maps of the project and <br /> rerouting during the one-year construction project. <br /> At the request of Mayor Roe, Ms. Kauppi reviewed the rationale in not adding an <br /> additional lane on the west bound side of Highway 36, with direction received by <br />
The URL can be used to link to this page
Your browser does not support the video tag.