Laserfiche WebLink
It1 <br />0p <br />Project Purpose and Need <br />- Replace existing bridge (constructed in 1938) <br />- Reconstruct roadway and ramp pavement and <br />improve geometry <br />- Replace existing signal systems <br />-Add sidewalk on east side of Lexington Ave <br />Estimated Project Construction Cost = $13.5 M <br />We! all have a stake in A0 <br />W Ut <br />