Laserfiche WebLink
<br /> ._~ <br /> .. ~ <br /> .i <br />Any Existinq Gradinq/Drainaqe/Erosion Concerns ? <br />NO <br />YES _X_ So:ae grading is to be done along .;he west side of th& <br /> lot for the additional parking lot. care DeGds to be <br /> taken so dirt and fill is not placed in the existlnCJ : <br /> Fu lham Pond.. "- <br /> Drainage Facilities Existinq ',!-o Be Built <br /> . <br /> Storm Sewer Rain X X <br /> - ~ <br /> 1'0001119 Area <br /> , -" <br /> catch Basins X X <br /> ........ -- v <br />Dascribe Grading/DrAinage/Erosion control plan: Silt fence is to be <br /> - <br />used next to the pond.. ~ -, <br />~ .1 <br />- ---...... pq J n <br />" <br />Any utility COncerns ? NO YES _X_ <br /> Utility Facilities Existin9 To B9: Bnilt <br /> , . ..... <br /> Water Main <br /> ~ ~ ~ ~~ J -.-- <br /> Water Saniee <br /> .,.,- I ~ <br /> Sanitary Sewer ltain <br /> . ~ <br /> Sanitary Sewer 3erv.. I <br /> ~ . <br />Describe Utility Service Plans: Existinq sewer and water servic&s 1:IIat <br />will be abandon must be done so at the .ins L The street repair must bs <br />checked by the City of Roseville's street <br />foreman.. <br />Any CUrb and Gutter to be Removed? NO YES _X_ <br />Any Road/Parking Facilities Concerns? NO YES <br />Describe Road/parking lots to be built: The east parlting lot will be <br />removed and a new par~lnq lot constructed along the north side of tbe <br /> <br />building. New curb wIll be placed around the new lot. <br />Page 2 <br /> <br />_. <br /> <br />. <br /> <br />, <br />.' <br /> <br />o~ <br /> <br />-, <br />'" <br />1 <br /> <br />:~ <br /> <br />- <br /> <br />,;, <br />,~:: <br />:~ <br />