Laserfiche WebLink
<br />Table 3D - Twin Lakes Parkway <br />Phase Two - Storm Sewer <br /> <br />Design and Administrative Costs @30% <br /> <br /> Unit <br />Qty. Price Amount <br />2 500 $ 1,000.00 <br />150 25 $ 3,750.00 <br />240 28 $ 6,720.00 <br />260 30 $ 7,800.00 <br />6 1800 $ 10,800.00 <br />15 12 $ 180.00 <br /> $ 30,250.00 <br /> $ 9,075.00 <br /> $ 3,025.00 <br /> $ 42,400.00 <br /> <br /> <br />Seq. MnOOT <br />No. No. Item Unit <br />1 2506.602 Connect to Existing EA <br />Storm Sewer <br /> <br />2 2503.541 12" RCP LF <br /> <br />3 2503.541 15" RCP LF <br /> <br />4 2503.541 18" RCP LF <br /> <br /> <br />5 2506.508 Construct Manhole (48" Dia) EA <br /> <br />6 2105.543 Stabilizing Aggregate Ton <br /> <br />Subtotal <br /> <br />Contigencies @ 1 0% <br /> <br />Total Estimated Costs <br />