Laserfiche WebLink
<br /> <br />Table 4C - Twin Lakes Parkway <br />Phase Three - Sanitary Sewer Construction <br /> <br />Design and Administrative Costs @30% <br /> <br /> Unit <br />Qty. Price Amount <br />2 $ 1,000.00 $ 2,000.00 <br />80 $ 40.00 $ 3,200.00 <br />2 $ 2,200.00 $ 4,400.00 <br /> $ 9,600.00 <br /> $ 2,880.00 <br /> $ 960.00 <br /> $ 13,400.00 <br /> <br /> <br />Seq. MnDOT <br />No. No. Item Unit <br />1 2503.603 Connect to Existing San. Sewer EA <br /> <br />2 2503.603 8" PVC LF <br /> <br />3 2503.602 Standard Manhole (48"Dia.) EA <br /> <br />Subtotal <br /> <br /> <br />Contigencies @ 1 0% <br /> <br />Total Estimated Costs <br />