Laserfiche WebLink
<br /> <br />Table 4E - Twin Lakes Parkway <br />Phase Three - Storm Sewer <br /> <br /> <br />Design and Administrative Costs @30% <br /> <br /> Unit <br />Qty. Price Amount <br />1 $ 500.00 $ 500.00 <br />50 $ 25.00 $ 1,250.00 <br />490 $ 28.00 $13,720.00 <br />450 $ 30.00 $ 13,500.00 <br />3 $ 1,800.00 $ 5,400.00 <br />15 $ 12.00 $ 180.00 <br /> $ 34,550.00 <br /> $ 10,365.00 <br /> $ 3,455.00 <br /> $ 48,400.00 <br /> <br /> <br />Seq. MnDOT <br />No. No. Item Unit <br />1 2506.602 Connect to Existing EA <br />Storm Sewer <br /> <br />2 2503.541 12" RCP LF <br /> <br />3 2503.541 15" RCP LF <br /> <br />4 2503.541 18" RCP LF <br /> <br />7 2506.508 Construct Manhole (48" Dia) EA <br /> <br />7 2105.543 Stabilizing Aggregate EA <br /> <br />Subtotal <br /> <br />Contigencies @ 1 0% <br /> <br />Total Estimated Costs <br />