Laserfiche WebLink
<br /> <br />Table 58 - Twin Lakes Parkway <br />Phase Four - Roadway Enhancements <br /> <br />Seq. MnDOT <br />No. No. <br />1 <br /> <br />Item <br />Street Lights @ 150' ac <br />Including Wiring & Feed <br />Points <br /> <br />Unit <br />EA <br /> <br />Qty. <br /> <br />Unit <br />Price Amount <br />10 3200 $ 32,000.00 <br /> <br /> <br />2 Street Trees, 3" Cal. EA 36 350 $ 12,600.00 <br /> @ 60' a.c., Boulevards and Median <br />3 10' Bituminous Walk wi Concrete LF 1240 28 $ 34,720.00 <br /> Edge Strips <br /> Subtotal $ 79,320.00 <br /> Design and Administrative Costs @30% $ 23,796.00 <br /> Contigencies @ 1 0% $ 7,932.00 <br /> Total Estimated Costs $ 111,000.00 <br />