Laserfiche WebLink
<br /> <br />Table 6 - 1-35W Interchange Including Cleveland Ave. South Bound Improvements <br />Ramp Reconfiguration <br /> <br /> <br />Seq. MnDOT Unit <br />No. No. Item Unit Qty. Price Amount <br />25 Storm Sewer MHs and Pipe LS $ 42,000.00 $ 42,000.00 <br />26 2575.501 Sodding w/4" Topsoil SY 1500 $ 4.00 $ 6,000.00 <br />27 2575.501 Seeding w/4" Topsoil Acre 5.75 $ 1 ,000.00 $ 5,750.00 <br />28 2573.502 Silt Fence LF 3220 $ 5.00 $ 16,100.00 <br />29 2573.501 Bale Check EA 100 $ 6.00 $ 600.00 <br />30 Signal Improvements at Cty. Rd. C LS $ 50,000.00 $ 50,000.00 <br /> Subtotal $ 1,068,495.00 <br /> Design and Administrative Costs @30% $ 320,548.50 <br /> Contigencies @ 10% $ 106,849.50 <br /> Total Estimated Costs $ 1,495,900.00 <br /> <br /> <br /> <br />