<br />NOTES <br /> <br />[ROSEDAiEHUB PAR~~G FACILITY MEETING <br />. ~~ June6,_~002 k;. ~-~-- <br />~~ <br /> <br />1. Introduction <br />Present: City of Roseville - Duane S., Cathy B., Dennis W., Deb B. <br />Metro Transit - Aaron 1. <br />Jones Lang LaSalle - Rollin R., Dan Pascale. <br /> <br />2. Progress Reports <br />Rosedale: Transit and parking need to be expanded to meet demand. <br /> <br />a. What other info needs to be shared? <br />.,,/ LaSalle to develop design attempt for Ramp and identifY what can be built for <br />$5 million. <br />" Roseville to proceed with code changes to SC Districts <br />/' Metro Transit to work with attorney on legal agreements necessary for ramp <br />construction and operation. <br />.f' Rosedale to work with County Assessor regarding tax implications of new <br />parking deck. <br />b. Reports. <br />of Roseville - City met with URS (contract engineer) to develop options for <br />transit hub location including connection over B2. Issues identified include: <br />access to Rosedale and grade change, visibility of Crossroads tenants, <br />ownership and maintenance, access from County B2. Rosedale prefers that <br />location be all inclusive on their site. <br />Metro Transit - There is some flexibility in the timing for the use of funds but <br />would prefer to stay on track with design in 2002 and construction in 2003. <br />Metro Transit would like to move forward with the bus staging area <br />improvements. The area could be moved but prefer to not lose the investment <br />that has already been made to the site. <br />~dale (Jones LangJ,.JlSall~) - Dan & Rollin provided an update on possible <br />expansion plans for Rosedale and how the ramp would work into the tentative <br />plans. Jones Lang LaSalle will provide some options for ramp locations. <br /> <br />Page 1 of2 <br />