Laserfiche WebLink
<br />8. Required Property Owner Notice: State Law requires publi~hed notice in a city's local paper a <br />minimum of 10 days prior to a public hearing. State law also;~quires notice be mailed to <br />property owners within 350 of the effected propeliy. Both nojces are prepared by the City of <br />Roseville; however, the applicant is responsible for providing 1he City with a certified list, <br />including two sets of mailing address labels of adjacent property owners within 350 feet of the <br />subject propeliy. Applicants have three options available to obtain the <br />certified/abstractor's list. The first option is to request the information from Ramsey <br />County Property Records; the second option is to request the information from a Title <br />Company; or the third option is to request the information from the City. Each option has a <br />specific charge for the list and labels. If selecting the City, the applicant must mark the front <br />of this application and pay the. appropriate fee at the time of application submittal. <br /> <br />9. Except as noted, the following information must be submitted with this applications: <br /> <br />A. Narrative: A written narrative must be provided inmpport of an application for a <br />conditional use permit. The narrative must fully dt':~cribe the proposed <br />development, with particular attention to any modi '''cations and limitations of the <br />use that have been made to insure its compatibility '~<i'ith surrounding uses, the <br />purpose and intent of the zoning ordinance, and tIll' Comprehensive Plan. <br /> <br />B. Proposed plans (10 copies) including site plan, land ~ape plan, grading and drainage <br />plan, and exterior building elevation drawings showmg building materials is <br />required. Such drawings shall be 8-1I2"xll" or 1l"x17"or PDF digital format. <br /> <br />10. Application Process: A completed application, applicable fee(s), and all accompanying <br />documents are to be submitted for review by the Development Review Committee (DRC). <br /> <br />11. Tentative Action Process: All applications are reviewed by the Development Review <br />Committee for completeness and an applicant is notified in writing by mail, e-mail, or fax within <br />10 calendar days after an application is submitted. All accepted applications will be forwarded to <br />the Roseville Planning Commission for consideration. <br /> <br />Attached is the tentative schedule for Planning Commission consideration and City Council <br />Action, as well as other deadlines. <br /> <br />12. Signature: The above statements are true and correct to the best of my knowledge. <br /> <br />Applicant Signature: <br /> <br /> <br />" <br /> <br />Property Owner Signature: <br /> <br />Date: ;, /IU ! (; I <br /> <br />Fax #: <br /> <br />E-mail Address: <br /> <br />/. Y(:/...I'\ G), JUft.O, Corr; <br />,- . <br /> <br />Revised Febmary 28, 2001 <br />Q:\Planning Commission \Land Use Applications\CUP Application.doc <br /> <br />Page2of2 <br />