My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03392
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3300
>
pf_03392
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 1:58:18 PM
Creation date
6/9/2005 1:12:42 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3392
Planning Files - Type
Interim Use Permit
Address
3000 hamline avenue
Project Name
Family Academy
Applicant
Hennessey, Ann
Status
Approved
PIN
032923130077
Date Final City Council Action
6/17/2002
Date Final Planning Commission Action
6/5/2002
Planning Files - Resolution #
10005
Additional Information
For temporary modular classroom
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 Extract of Draft Minutes, Planninl! Commission Meetinl!, June 5, 2002: <br />2 <br />3 a. Planninl! File 3392: Request by Family Academy for an Interim Use <br />4 Permit to allow the temporary placement of a 56-foot by 72-foot <br />5 modular (portable) classroom adjacent (south) the existing school, 3000 <br />6 Hamline Avenue. <br />7 <br />8 Chairman Duncan opened the hearing and requested City Planner Thomas <br />9 Paschke provide a summary of the project report dated June 5, 2002. <br />10 <br />11 Family Academy Charter School has submitted an application for an Interim Use <br />12 Permit to allow a temporary modular classroom building (two units, total size 56 <br />13 foot by 72 foot) on the south side of the school and adjacent to the front parking <br />14 lot along Hamline Avenue. <br />15 <br />16 Family Academy has experienced steady student enrollment increases since 2000 <br />17 and has in interest in offering additional programs. They have determined a need <br />18 for four additional classrooms outside of the existing (limited) classroom space <br />19 within Advent Lutheran Church, and have proposed installing a 56-foot by 72- <br />20 foot (two units - 4,032 sq. ft.) modular classroom building on the south side of <br />21 the school portion of the church. <br />22 <br />23 Thomas Paschke noted that bathroom capacity has not been determined at this <br />24 time. <br />25 <br />26 The Planning staff recommended approval with conditions. <br />27 <br />28 Thomas Paschke explained past Interim Use Permits. <br />29 <br />30 Member Mulder asked for duration of the office interim use (three years). <br />31 <br />32 Ann Hennessey, Family Academy Dean, noted the growth of the student <br />33 enrollment to 180; 6th, i\ 8th grade students need more space; N.E. 916 will also <br />34 need placement space for children with hearing problems. <br />35 <br />36 The maximum student enrollment is 225 students. The Charter School leases <br />37 space for the three years. Advent Lutheran could expand their classroom space <br />38 or the School will look for other space. <br />39 <br />40 Member Cunningham asked what the viability of long-term leases with Advent <br />41 Lutheran was. The School would stay if the Church expanded. <br />42 <br />43 Member Mulder questioned the children's needs to move into the Church for <br />44 lavatories. The lavatories should be placed in the interim buildings. <br />45 <br />46 Member Cunningham asked if sheltered walkways could be used for egress to <br />47 Church. <br />48 <br />49 There were no public comments. Chair Duncan closed the hearing. <br />50 <br />51 Thomas Paschke noted the Church representatives supported the proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.