Laserfiche WebLink
<br />Investh~ation Fee: Work without a Permit <br />. Whenever any work for which a permit is required from the city has been commenced <br />without first obtaining said permit, a special investigation shall be made before a permit may <br />be issued for such work. An investigation fee, in addition to the permit fee, shall be collected <br />whether or not a permit is then or subsequently issued. The investigation fee shall be equal to <br />the amount of the permit fee required by this code. The payment of such investigation fee <br />shall not exempt any person from compliance with all other provisions of this code nor from <br />any penalty prescribed by law. <br /> <br />Manufactured Home Permit Fee: <br />. New installation <br /> <br />$150.00 <br /> <br />Mechanical Permit Fee: <br />. Residential <br />- Air conditioning new <br />- Air conditioning - replacement <br />- Warm air furnace - new <br />- Warm air furnace - replacement <br />- Hot water boilers - new <br />- Hot water boilers - replacement <br />- Unit heaters <br />- Swimming pool heaters <br />- Miscellaneous work & gas piping <br />- Minimum fee <br />- Gas fireplace <br />. Commercial <br />- All commercial work <br /> <br />$35.00 <br />$35.00 <br />$75.00 <br />$40.00 <br />$ 7 5.00 <br />$40.00 <br />$40.00 <br />$40.00 <br />1.25 % of estimated job cost <br />$35.00 <br />$40.00 <br /> <br />1.25 % of estimated job cost <br /> <br />Movin2: Permit Fee: <br />. Over private property only <br />. Over public streets <br />. Investigation fee <br /> <br />$50.00 <br />$100.00 <br />$50.50/hour <br /> <br />Plumbin2: Permit Fee: <br />. Administrative/minimum fee <br />- Plus, for each fixture opening <br />. Miscellaneous work <br />. Backflow prevention verification <br /> <br />$35.00 <br />$8.00 <br />1.25 % of estimated job cost <br />$20.00 <br /> <br />Plan Review Fee: <br />. When a building permit is required and a plan is required to be submitted, a plan checking fee <br />shall be paid. Plan checking fees for all buildings, except for construction costs in R-1 and <br />R-2 zones which do not involve new single family structures and are ofless than fifteen <br />thousand dollars ($15,000.00), shall be sixty five percent (65%) of the building permit fee as <br /> <br />7 <br />