Laserfiche WebLink
<br />Page 3 <br /> <br />Section 9, Item k: The current drainage from Mr Jordahl's garage is towards our lot. The proposed <br />setback permit does not address how to avoid the proposed garage roof water from draining into our <br />lot. <br /> <br /> <br /> <br />Date: OS/21/03, Time: 7:42 AM, File: Jordahl_Setback]ermit_052203.doc <br />