My WebLink
|
Help
|
About
|
Sign Out
Home
2014-12-02_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2014
>
2014-12-02_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 9:01:27 AM
Creation date
1/8/2015 9:01:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ROSEVILLE <br />PARKS AND RECREATION RENEWAL PROGRAM <br />PROJECT PROGRESS REPORT <br />November 26, 2014 <br />PROJECT NAMESTART STATUSCOMMENTS <br />DATE <br />A.BUILDING <br />REPLACEMENT/SITE <br />Lexington Park 5/201495% complete Open HousePlannedfor <br />December, 2014 <br />Sandcastle Park 6/201490% complete Open House Plannedfor <br />December, 2014 <br />Villa Park6/201585% complete Open House Plannedfor <br />December, 2014 <br />Autumn Grove Park9/201440% complete,Open House Plannedfor <br />Framing begunJanuary, 2015 <br />Oasis Park 9/201425% complete Open House Plannedfor <br />January, 2015 <br />Rosebrook Park 9/201410% complete Open House Plannedfor <br />January, 2015 <br />B.SHELTER REMODEL <br />CP FOR Parks–DALE STREET9/201495% completeFall completion planned <br />CP Foundation -WEST9/2014100% completeFall completion planned <br />CP Ballfields 9/201450% complete Fall completion planned <br />SKATING CENTER <br />C. <br />REPAIRS <br />Painting of Exterior 8/2014100 % complete <br />Replace exterior doorson Arena 50% completeCurrently being installed <br />Block Work Reviewing quotes-2015 <br />project <br />Vestibule Improvements Finalizing plans –2015 <br />project <br />D.HANC <br />Exterior Work 6/201490% completeOctober Completion <br />Interior Work 11/201430% complete2/2015 completion <br />Boardwalk 11/20145% completeSpring 2015completion– <br />currently fabricating <br />E.BRIDGE REPLACEMENT <br />Villa Park 7/20145% completeFebruary 2015 install <br />completion expected – <br />currently fabricating <br />F.LIGHTING SYSTEMS <br />REPLACEMENT <br />Lake Bennett Trail 6/201495% complete <br />1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.