My WebLink
|
Help
|
About
|
Sign Out
Home
pf_01867
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF1000 - PF1999
>
1800-1899
>
pf_01867
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2024 12:47:05 PM
Creation date
7/22/2005 6:40:53 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
1867
Planning Files - Type
Special Use Permit
Address
2755 LEXINGTON AVE N
Project Name
LEXINGTON AVENUE LTD. PARTNERSHIP
Applicant
GEORGE REILING
Status
Approved
Date Final City Council Action
9/12/1988
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Ii. Continued. <br /> <br />of approximately 920 feet above sea level. The surface 0: Lake <br />Josephine is at an elevation of approximately 885 fee~. Groundwater is <br />likely at approximately the same elevat10n as the lake which would be at <br />a depth of approximately 35 feet below the site. <br /> <br />18. Does any p!rt of the project area involve: <br /> <br />a. shoreland zoning district? X No Yes <br />b. delineated 100wyear floodplain? ~No ---Yes <br />c. state or federally designated river land use distr1ct? X No ---Yes <br /> <br />If yesl ident1fy water body and applicable state class1ficat~on(s)1 and <br />descr1be measures to protect water and related land rp.sources: <br /> <br />19. Describe any physical alteration (e.g., dikesl excavation I f1111 st~ftam <br />diversion) of any drainage system lake. stream and/or wetland. Describe <br />~~asures to mtnimize imp~inr.ent of the water-r~lated resources. <br />Estimate quantity of mater1al to be dredged ~nd indicate where spOils <br />will be deposited. <br /> <br />Not Applicable. There will be ~o physical alteration of ~ny dra1nage <br />sy~tem. <br /> <br />20. a. Will the project requ1re an appropriation of ground or surface <br />~ater? ___No -!-Yes <br /> <br />If yes, explain (ind1cate quantity and source): <br /> <br />A w&ll may be necessary to mainta1n the level of the retention pond <br />during summer months. Tne need for a well will be detennined <br />during site engineering. <br /> <br />b. Will the project affect groundwater levels in any wells (on or off <br />the s1te)? -!-No ___Yes <br /> <br />If yes. e)'plain: <br /> <br />21. Describe the erosion and sedimentat10n control measures to be used <br />dur1ng and after construction of the project. <br /> <br />Erosion and sedimentat10n w1ll be controlled by in:tallin; hay bales <br />around catch basins during construction and b~ surfacing or revegetating <br />disturbed areas as soon as practical. All d1sturbed areas will be sur- <br />face~ or revegetated using sod. plantlngs, seeding, or other ground <br />cover mater1al. <br /> <br />22. a. Will the project generate: <br /> <br />1. surface and stonn water runoff? <br />2. sanitary wastewater? <br /> <br />No X Yes <br />No IYes <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.