My WebLink
|
Help
|
About
|
Sign Out
Home
2015_0126_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2015
>
2015_0126_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2015 1:16:31 PM
Creation date
1/22/2015 2:19:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6 – PROJECT ASSUMPTIONS <br />A detailed list of all proposal assumptions that may impact cost, schedule, or satisfaction. <br /> <br /> <br />Assumption 1: City of Roseville is acting as the Construction Manager. <br />Mickman Brothers, Inc. has not included any fees for the management and <br />Solution / Strategy: coordination of work with other trades on this project. Scheduling conflicts <br />to be coordinated by the Construction Manager. <br />Parks will be considered at final grade prior to commencement of <br />Assumption 2: <br />irrigation work. <br />Written irrigation schedule to be provided once notification has been <br />Solution / Strategy: provided that project site is ready for construction and is considered to be <br />at final grade. <br />All sodding and/or seeding of park sites following irrigation construction <br />Assumption 3: <br />work is to be provided by others. <br />Solution / Strategy: N/A <br />Project schedules and values to be finalized after inspection of existing <br />Assumption 4: <br />conditions. <br />Mickman Brothers will inspect existing irrigation systems and communicate <br />Solution / Strategy: <br />with City for discussion of existing conditions. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.