My WebLink
|
Help
|
About
|
Sign Out
Home
2015-01-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2015
>
2015-01-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 4:27:23 PM
Creation date
1/22/2015 4:21:46 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/27/2015
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
309 <br />310 <br />311 <br />312 <br />313 <br />314 <br />315 <br />316 <br />317 <br />318 <br />319 <br />320 <br />321 <br />322 <br />323 <br />324 <br />325 <br />Discussion ensued regarding funding options; with Mr. Schwartz recommending <br />that the City Council make that decision; with staff to consider minimum and <br />maximum sizes to consider per rooftop, and provide costs on various inverters <br />and products, with the PWETC leaning toward those locally made inverters <br />and/or panels. <br />Ayes: 7 <br />Nays: 0 <br />Motion carried. AL <br />Member Cihacek asked that staff include solar updates as a future agenda item, <br />which was duly noted by Mr. Culver. W 1W <br />Chair Stenlund thanked representatives o undial Solar; and asked that the <br />responses to questior <br />dissemination to the - <br />326 Recess <br />327 Chair Stenlund recessed the <br />328 approximately 7:52 p.m. <br />329 <br />330 6. <br />331 <br />332 <br />333 <br />334 <br />335 <br />336 <br />337 <br />338 <br />339 <br />340 <br />341 <br />ion be rovided to staff for <br />.m. and reco ned at <br />Upcoming MnDOT ProjeWtnfoifffiation <br />City Engineer Marc Culver presented information on 2015 MnDOT Construction <br />projects, specifically those impacting Roseville and its r dents (Attachment A). <br />In response to a question by Member Cihacek, Mr. ulver advised that MnDOT <br />representatives had made this presentation to the City Council in October, and <br />while they could have been ask to attend the PWETC meeting, staff felt they <br />could provide the information. <br />Member Cihacek asked that, in the future, a MnDOT be present to respond to <br />questions of the PWETC, with that request duly noted by staff. <br />342 <br />Mr. Culver provided information on various Ramsey County and MnDOT <br />343 <br />projects, including bri e replacements, and potential road closures and/or <br />344 <br />detours. Mr. Culver a dressed the Snelling Avenue project in detail and impacts <br />345 <br />it would have on Roseville residents, due to resurfacing south of the Minnesota <br />346 <br />State Fairgrounds and re -decking the bridge over I-94; with some minor impacts <br />347 <br />already due to advance utility work. Mr. Culver noted the need to work around <br />348 <br />the State Fair dates, but anticipated traffic back-ups throughout the Snelling <br />349 <br />Avenue corridor during the major portion of the work. <br />350 <br />351 <br />Mr. Culver noted that the current road systems in the NE Metro were already <br />352 <br />running at or over capacity, and when one route was lost it put strains on the <br />353 <br />remaining routes. <br />354 <br />Page 8 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.