Laserfiche WebLink
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: January 27, 2015 Item No: 4 <br />Item Description: Communication Items <br />Projects update: <br />• Snelling Ave Bus Rapid Transit: This project is still on schedule for a 2015 construction <br />timeline with actual bus operations beginning in the end of 2015. <br />• Victoria Street Reconstruction and Sidewalk Project: An update will be given on this project <br />at tonight's meeting. Since the PWETC last met, a public meeting was held with the <br />neighborhood to review the proposed design and discuss proposed assessments. The City <br />Council accepted the Feasibility Report and ordered a Public Hearing for this project on <br />February 23`a <br />• Work continues on finalizing the details for the 2015 Work Plan, specifically the Pavement <br />Management Program. More information will be presented in February about the final <br />proposed segments for mill and overlay. <br />• Lift Stations: Council recently authorized staff to enter into design contracts with Bolton & <br />Menk for the Wagner Sanitary Sewer lift station and SEH, Inc. for the St Croix storm water <br />lift station. The Wagner lift station will be completely replaced whereas the St Croix lift <br />station will be refurbished with new pumps and electronics. Both lift stations should be under <br />construction in 2015. <br />Maintenance Activity: <br />• Street maintenance staff is providing winter snow and ice control as necessary, boulevard tree <br />trimming, and sign maintenance as well as other preventative equipment maintenance. <br />• Utility crews have been busy with occasional water main breaks and other normal seasonal <br />maintenance activity. Frost levels are at 3 plus feet which is normal or slightly below for this <br />time of year. <br />Other: <br />Staff will brief the Commission on some possible department reorganization for facility <br />management due to a recent retirement. <br />Attachments: <br />A: 2015 Street/Pathway Project Map <br />B: 2015 Utility Project Map <br />C: Tax Increment Fund Balance Information <br />