Laserfiche WebLink
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: January 27, 2015 Item No: 9 <br />Item Description: Victoria Street Reconstruction Plan Review <br />Background: <br />Victoria Street from Larpenteur Ave to County Road B is scheduled for reconstruction in 2015. This <br />roadway segment has been on the City's CIP for the past several years and is now at a point where <br />pavement conditions warrant the reconstruction and funding is available. <br />Victoria Street was historically a Ramsey County facility, but in 1991 Ramsey County turned over <br />jurisdiction of the roadway to the City of Roseville. The roadway is designated as a Municipal State Aid <br />Street and therefore is eligible for State Aid funding. Also, as this is a full reconstruction of the roadway, <br />a portion of the project costs will be assessed to the benefiting properties. <br />The project will involve the full depth replacement of the pavement and the replacement of any <br />bituminous curb with new concrete curb and gutter. The project will also install a new pathway along the <br />east side of Victoria Street. The pathway, proposed to be a 8 foot bituminous path between Larpenteur <br />and Roselawn and a 6 foot sidewalk north of Roselawn, will extend beyond the roadway reconstruct <br />project area and connect with the new sidewalk at County Road 132. The portion from County Road B to <br />County Road 132 will be funded with Park Renewal funds. <br />In the area north of Roselawn Ave, over 75% of the total roadway length has in place bituminous curb <br />and gutter. Therefore, in order to meet State Aid standards, this section will be designed as an urban <br />section with full curb and gutter, filling the existing gaps. We are currently working with the Capital <br />Region Watershed District and the Minnesota Department of Transportation State Aid office to determine <br />if ribbon curb can be used along the wetland section of this area. The roadway will maintain its current <br />width of 32 feet wide and will allow parking on the east side of the roadway. <br />South of Roselawn Ave the City will maintain the rural section and not install curb and gutter (there is <br />some bituminous curb that will need to be replaced leading up to Roselawn Ave). This will still meet <br />State Aid standards. The roadway will maintain the 32 foot width here and will have parking on the east <br />side only. <br />Attached is the Feasibility Report for this project which provides more detail on the proposed <br />construction project as well as proposed assessments for the benefiting properties. <br />Recommended Action: <br />Receive a presentation on the Victoria Street Reconstruction Project. <br />Attachments: <br />A: Feasibility Report <br />