Laserfiche WebLink
January 12, 2015 <br />City Council <br />City of Roseville <br />2660 Civic Center Drive <br />Roseville, MN 55113 <br />RE: PROJECT P -ST -SW -15-02, Victoria St Reconstruction <br />Feasibility Report <br />Dear Mayor and City Council Members: <br />At their October 27, 2014 meeting, the City Council adopted Resolution No. 11184 ordering the <br />preparation of a Feasibility Report for the reconstruction of Victoria Street between Larpenteur <br />Ave and County Road B. <br />The total estimated project cost is $1,833,245.00 which includes contingencies. <br />During the process of studying the existing conditions within the project area, two Public <br />Information meetings were held and input was received from area residents and other City <br />department staff. The comments from these meetings are incorporated into the report. <br />In accordance with the City Council request, the study has been completed. It is my <br />recommendation that the project as proposed in this study is feasible. <br />If you have questions regarding the findings and recommendations in the report please contact me <br />directly. <br />Sincerely, <br />Marcus J. Culver, P. E. <br />City Engineer <br />651-792-7042 <br />marc. culver(cDcityofrosevi II e.com <br />Project P -ST -SW -W-15-02 <br />Victoria Street Reconstruction <br />3 <br />Feasibility Report <br />