Laserfiche WebLink
CONCLUSIONS & RECOMMENDATIONS <br />A. All portions of the project proposed are feasible. <br />B. Estimated project cost: <br />The following is a summary of the recommendations discussed in this report. <br />A. Construct the project in 2015 <br />B. Construct a 6 ft wide concrete sidewalk along the east side of Victoria Street north of Roselawn <br />Ave, extended north to County Road B2 (roadway reconstruction stops at County Road B) <br />C. Construct an 8 ft wide bituminous path along the east side of Victoria Street south of Roselawn <br />Ave (subject to change to a 6 ft sidewalk based on final engineering). <br />D. South of Roselawn Ave: <br />• Construct a 32 ft wide, bituminous street with a rural design (no curb and gutter) <br />• 11 foot lanes <br />• Prohibit parking on one side of the roadway (proposed west side of roadway) <br />• Provide a 2 ft shoulder on the west side of Victoria Street <br />• Provide an 8 ft shoulder on the east side of Victoria Street for parking. <br />E. North of Roselawn Ave: <br />• Construct a 32 ft wide, bituminous street with B-618 concrete curb and gutter. <br />• Provide an 8 ft shoulder on the east side of Victoria Street for parking. <br />F. Repair sanitary sewer and watermain infrastructure along the corridor as needed. <br />G. Construct storm sewer improvements to address water quality, meet watershed requirements <br />for new impervious surfaces, and address drainage concerns along the corridor. <br />H. Fund the reconstruction project with Municipal State Aid funds, utility funds, assessments and <br />Park Renewal Bond funds as detailed this report. <br />I. Schedule a public hearing for the Victoria Street project on Monday, February 23, 2015. <br />Project P -ST -SW -15-02 <br />Victoria Street Reconstruction <br />12 <br />Feasibility Report <br />Project Cost <br />Street Reconstruction <br />$1,290,805.20 <br />Sidewalk Construction Segment A <br />(Larpenteur Ave to County Road B) <br />$170,440.00 <br />Sidewalk Construction Segment B <br />(County Road B to County Road B2) <br />$120,000.00 <br />Storm Sewer Construction <br />$215,000.00 <br />Utility Maintenance <br />$37,000.00 <br />Total <br />$1,833,245.20 <br />The following is a summary of the recommendations discussed in this report. <br />A. Construct the project in 2015 <br />B. Construct a 6 ft wide concrete sidewalk along the east side of Victoria Street north of Roselawn <br />Ave, extended north to County Road B2 (roadway reconstruction stops at County Road B) <br />C. Construct an 8 ft wide bituminous path along the east side of Victoria Street south of Roselawn <br />Ave (subject to change to a 6 ft sidewalk based on final engineering). <br />D. South of Roselawn Ave: <br />• Construct a 32 ft wide, bituminous street with a rural design (no curb and gutter) <br />• 11 foot lanes <br />• Prohibit parking on one side of the roadway (proposed west side of roadway) <br />• Provide a 2 ft shoulder on the west side of Victoria Street <br />• Provide an 8 ft shoulder on the east side of Victoria Street for parking. <br />E. North of Roselawn Ave: <br />• Construct a 32 ft wide, bituminous street with B-618 concrete curb and gutter. <br />• Provide an 8 ft shoulder on the east side of Victoria Street for parking. <br />F. Repair sanitary sewer and watermain infrastructure along the corridor as needed. <br />G. Construct storm sewer improvements to address water quality, meet watershed requirements <br />for new impervious surfaces, and address drainage concerns along the corridor. <br />H. Fund the reconstruction project with Municipal State Aid funds, utility funds, assessments and <br />Park Renewal Bond funds as detailed this report. <br />I. Schedule a public hearing for the Victoria Street project on Monday, February 23, 2015. <br />Project P -ST -SW -15-02 <br />Victoria Street Reconstruction <br />12 <br />Feasibility Report <br />