My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03448
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3400
>
pf_03448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 2:28:24 PM
Creation date
8/25/2005 9:09:25 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3448
Planning Files - Type
Planned Unit Development
Address
1910 Coun ty Road C
Project Name
Gem Investments/Casci, Mark
Applicant
Abra Auto Body & Glass
Status
Approved
Date Final City Council Action
11/17/2003
Additional Information
PUD/Final Plat/Rezoning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Community Development Department <br />651-490-2279 . fax: 651-490-2931 <br /> <br />. <br /> <br />Submittal of a landscape plan to the DRC for review and Comment. Said plan must <br />include plantings throughout the site and within designated areas (islands) within the <br />parking lot. Section 1010.05 and 1010.14 of the City Code stipulate requirements for <br />parking lots and materials size and type respectively. <br /> <br />. <br /> <br />Building and parking setbacks appear to be adequate; however, parking lots need to be a <br />minimum of 10 feet from the building. <br /> <br />. <br /> <br />The fencing proposed at the rear of the Abra building should not be chain link, but rather <br />an upgraded material such as treated or stained wood. <br /> <br />. <br /> <br />The uses within the office/warehouse building must be identified in the proposal so that <br />they can be incorporated into the PUD. After identified, staff may have additional <br />questions or concerns with the use and operation of the office/warehouse building. <br /> <br />. <br /> <br />Elevations for the office/warehouse building along with materials details must be <br />provided with the next plan submittal. <br /> <br />. <br /> <br />All site signage plans (building and free standing) must accompany the revised submittal. <br /> <br />. <br /> <br />Although it is an upgraded concrete masonry unit, burnished block may not be permitted. <br />To date I have not received a response on whether this material is consistent with Section <br />1010.02 of the Roseville City Code. <br /> <br />For the most part these are very general comment, most of which can be further discussed as you <br />proceed through the next steps. Should you have any questions or comments, please feel free to <br />call me at 651-490-2236. <br /> <br />Sincerely, <br /> <br />CITY of ROSEVILLE <br /> <br />Thomas Paschke <br />City Planner <br />
The URL can be used to link to this page
Your browser does not support the video tag.