My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03578
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3500
>
pf_03578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 2:35:15 PM
Creation date
4/3/2006 10:58:07 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3578
Planning Files - Type
Comprehensive Plan Amendment
Project Name
Guptil development
Applicant
City of Roseville
Status
Approved
Date Final City Council Action
8/9/2004
Date Final Planning Commission Action
7/7/2004
Additional Information
McCarrons neighborhood master plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />The McCarrons Plan study area has over 100 multifamily units. The proposed project <br />provide the basis for future redevelopment and a system of connections between existing and <br />new housing, essential and employment through transit linkages and public pathways. <br />This proposal is consistent with surrounding uses and the objectives approved in the City <br />Comprehensive Plan to provide a mix different housing choices Cycle Housing). <br /> <br />As a part of the City and RHRA program to encourage choice and opportunity in housing, the <br />developers of this project must agree to market and promote this senior housing project to <br />Roseville residents for at least 60 days prior to marketing to the broader community. This has <br />effectively been done through area faith based and senior organizations such as churches and <br />senior centers. The developer must also agree to participate in the Senior Housing Regeneration <br />Program (SHRP) which provides a link between single family homes being vacated by seniors <br />and purchased by first time buyers. The developer must promote the SHRP as part of the project <br />sales program and include information regarding the program to each potential purchaser or <br />renter in the project. <br /> <br />12. Parking: <br /> <br />The redevelopment of Guptil site should minimize the surface parking area to reduce lot <br />coverage when possible. Underground or in building parking is encouraged for multiple <br />residential developments to maintain as much green space and pervious surface as possible. On <br />street parking is not to be encouraged. Shared parking and driveway access between the Galilee <br />Church and Guptil site should be encouraged if feasible. <br /> <br />13. Public Open SpacelTrails: <br /> <br />Any redevelopment within the study area should incorporate public open spaces and connectivity <br />to existing and new neighborhood and trail systems. Public access should be provided to and <br />from all open space areas. Appropriate landscaping and street trees will be provided in all public <br />roadway areas and trails consistent with the City of Roseville Street Tree Master Plan. <br /> <br />The existing pond at the Guptil site should be enhanced and include a walking path with benches <br />to the benefit of the new residents. In addition, easements should be provided for a pathway <br />between the Guptil site, the Church and the Armory. <br /> <br />14. Quality Design Standards: <br /> <br />It is critical that the first phase of development set the standard for quality and innovative design <br />that will be carried out throughout the entire study area as redevelopment occurs. The designs <br />are to be residential and human scale with the mass and height of buildings to match the context <br />of the existing construction where possible. <br /> <br />Final Version <br /> <br />13 <br /> <br />July 26, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.